Assessment Year 2011
Principal Product aircraft de-icing systems
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 370
Plant Area 14,700
ft2
Annual Production 115,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,492 4,899,679
kWh
Electricity Demand $137,023 12,419
kW-mo/yr
Natural Gas $331,669 27,472
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,833

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $19,052 $63,760 $(-19.0)
(-756)
kWh
$(-132.0)
-
kW-mo/yr
$19,203
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $6,433 $8,495 - - $6,433
-
MMBtu
03 2.4239: Eliminate or reduce compressed air usage $4,569 $14,510 $2,876
111,398
kWh
$1,693
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $4,500 $4,500 - - $4,500
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $764 $480 $411
15,991
kWh
$353
-
kW-mo/yr
-
TOTAL RECOMMENDED $35,318 $91,745 $3,268
126,633
kWh
$1,914
-
kW-mo/yr
$30,136
-
MMBtu
TOTAL IMPLEMENTED $9,833 $19,490 $3,287
127,389
kWh
$2,046
-
kW-mo/yr
$4,500
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs