Assessment Year | 2024 |
---|---|
Principal Product | extruded plastic sheets |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 24 |
Plant Area |
60,000
ft2
|
Annual Production | 7,500,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,225 | 1,510,266 |
kWh
|
$0.12 |
Electricity Demand | $33,228 | 1,800 |
kW-mo/yr
|
$18.46 |
TOTAL YEARLY COSTS | $212,453 | |||
RECOMMENDED SAVINGS* | $12,017 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,926 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $780 | - |
$780
6,557
kWh
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $58 | - |
$58
485
kWh
|
|
03 | 2.6241: Reduce temperature of process equipment when on standby | $626 | - |
$626
5,277
kWh
|
|
04 | 2.2511: Insulate bare equipment | $9,629 | $1,369 |
$9,629
81,132
kWh
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $16 | $39 |
$16
135
kWh
|
|
06 | 2.7135: Install occupancy sensors | $449 | $178 |
$449
3,780
kWh
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $185 | $786 |
$185
1,560
kWh
|
|
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $274 | - |
$274
2,305
kWh
|
|
TOTAL RECOMMENDED | $12,017 | $2,372 |
$12,017
101,231
kWh
|
||
TOTAL IMPLEMENTED | $10,926 | $2,155 |
$10,926
92,039
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs