ITAC Assessment: SJ0010
ITAC logo
ITAC Assessment: SJ0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product extruded plastic sheets
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 24
Plant Area 60,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,225 1,510,266
kWh
Electricity Demand $33,228 1,800
kW-mo/yr
TOTAL YEARLY COSTS $212,453
RECOMMENDED SAVINGS* $12,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $780 - $780
6,557
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $58 - $58
485
kWh
03 2.6241: Reduce temperature of process equipment when on standby $626 - $626
5,277
kWh
04 2.2511: Insulate bare equipment $9,629 $1,369 $9,629
81,132
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $16 $39 $16
135
kWh
06 2.7135: Install occupancy sensors $449 $178 $449
3,780
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $185 $786 $185
1,560
kWh
08 2.6212: Turn off equipment during breaks, reduce operating time $274 - $274
2,305
kWh
TOTAL RECOMMENDED $12,017 $2,372 $12,017
101,231
kWh
TOTAL IMPLEMENTED $10,926 $2,155 $10,926
92,039
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs