Assessment Year | 2010 |
---|---|
Principal Product | Galvanized Steel |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3496: Miscellaneous Fabricated Wire Products |
Sales Range | $100 M to 500M |
# of Employees | 65 |
Plant Area |
106,165
ft2
|
Annual Production | 300,000
ton
|
Production Hrs. Annual | 8,312
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $616,823 | 9,393,600 |
kWh
|
$0.066 |
Electricity Demand | $157,075 | 23,875 |
kW-mo/yr
|
$6.58 |
Electricity Fees | $288 | - |
|
- |
Natural Gas | $2,644,248 | 226,896 |
MMBtu
|
$11.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $280,344 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,098 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 4.652: Replace existing equipment with more suitable substitutes | $165,791 | $87,000 | - | - |
$165,791
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $75,243 | $91,000 |
$(-371.0)
(-5,652)
kWh
|
$(-53.0)
-
kW-mo/yr
|
$75,667
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,098 | $49,200 |
$15,335
233,405
kWh
|
$1,763
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $15,356 | $7,809 |
$13,408
204,084
kWh
|
$1,948
-
kW-mo/yr
|
- | |
05 | 2.4239: Eliminate or reduce compressed air usage | $3,767 | $65 |
$3,293
50,121
kWh
|
$474
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,089 | $245 |
$2,714
41,310
kWh
|
$375
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $280,344 | $235,319 |
$34,379
523,268
kWh
|
$4,507
-
kW-mo/yr
|
$241,458
-
MMBtu
|
||
TOTAL IMPLEMENTED | $17,098 | $49,200 |
$15,335
233,405
kWh
|
$1,763
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs