Assessment Year | 2005 |
---|---|
Principal Product | Soap |
NAICS | 325611: Soap and Other Detergent Manufacturing |
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $10 M to 50M |
# of Employees | 126 |
Plant Area |
200,000
ft2
|
Annual Production | 75,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,397 | 4,425,600 |
kWh
|
$0.041 |
Electricity Demand | $113,573 | 12,364 |
kW-mo/yr
|
$9.19 |
Electricity Fees | $8,505 | - |
|
- |
Natural Gas | $491,463 | 67,852 |
MMBtu
|
$7.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,926 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,463 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $16,069 | $12,540 | - | - | - |
$16,069
-
MMBtu
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,056 | $26,912 |
$6,384
182,462
kWh
|
$3,523
-
kW-mo/yr
|
$149 | - | - | |
03 | 2.2135: Repair and eliminate steam leaks | $7,498 | $89 | - | - | - |
$7,498
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $5,737 | $685 | - | - | - |
$5,737
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,326 | $19,601 |
$2,939
83,987
kWh
|
$2,309
-
kW-mo/yr
|
$78 | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,219 | $1,480 |
$4,156
118,790
kWh
|
- | $63 | - | - | |
07 | 2.8123: Pay utility bills on time | $3,704 | - | - | - | - | - | $3,704 | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,474 | $203 |
$2,437
69,656
kWh
|
- | $37 | - | - | |
09 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $2,353 | $231 |
$1,343
38,375
kWh
|
$976
-
kW-mo/yr
|
$34 | - | - | |
10 | 2.7124: Make a practice of turning off lights when not needed | $1,338 | $1,215 |
$1,318
37,670
kWh
|
- | $20 | - | - | |
11 | 2.7229: Air condition only space necessary | $891 | $240 |
$314
8,986
kWh
|
$564
-
kW-mo/yr
|
$13 | - | - | |
12 | 2.7261: Install timers and/or thermostats | $261 | $204 | - | - | - |
$261
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $59,926 | $63,400 |
$18,891
539,926
kWh
|
$7,372
-
kW-mo/yr
|
$394 |
$29,565
-
MMBtu
|
$3,704 | ||
TOTAL IMPLEMENTED | $11,463 | $293 | - | - | - |
$7,759
-
MMBtu
|
$3,704 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs