ITAC Assessment: IC0206
ITAC logo
ITAC Assessment: IC0206
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Metal Parts
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 244,000
ft2
Annual Production 8,500,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,753 7,879,297
kWh
Electricity Demand $57,506 7,332
kW-mo/yr
Natural Gas $105,017 24,196
MMBtu
TOTAL YEARLY COSTS $694,276
RECOMMENDED SAVINGS* $10,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,280 $290 $855
12,577
kWh
$425
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,708 $1,690 $1,708
25,117
kWh
- -
03 2.7231: Use radiant heater for spot heating $2,158 $3,396 - - $2,158
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,289 $750 $1,289
18,443
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,299 $2,713 $4,299
61,520
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $244 $191 $244
3,595
kWh
- -
TOTAL RECOMMENDED $10,979 $9,030 $8,396
121,252
kWh
$425
-
kW-mo/yr
$2,158
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs