Assessment Year | 2018 |
---|---|
Principal Product | Metal Parts |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
244,000
ft2
|
Annual Production | 8,500,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $531,753 | 7,879,297 |
kWh
|
$0.067 |
Electricity Demand | $57,506 | 7,332 |
kW-mo/yr
|
$7.84 |
Natural Gas | $105,017 | 24,196 |
MMBtu
|
$4.34 |
TOTAL YEARLY COSTS | $694,276 | |||
RECOMMENDED SAVINGS* | $10,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,280 | $290 |
$855
12,577
kWh
|
$425
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,708 | $1,690 |
$1,708
25,117
kWh
|
- | - | |
03 | 2.7231: Use radiant heater for spot heating | $2,158 | $3,396 | - | - |
$2,158
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,289 | $750 |
$1,289
18,443
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,299 | $2,713 |
$4,299
61,520
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $244 | $191 |
$244
3,595
kWh
|
- | - | |
TOTAL RECOMMENDED | $10,979 | $9,030 |
$8,396
121,252
kWh
|
$425
-
kW-mo/yr
|
$2,158
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs