ITAC Assessment: WV0398
ITAC logo
ITAC Assessment: WV0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Galvanized steel sheet
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $100
M
to 500
M
# of Employees 65
Plant Area 106,160
ft2
Annual Production 300,000
ton
Production Hrs. Annual 8,312
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $616,823 9,393,600
kWh
Electricity Demand $157,075 23,875
kW-mo/yr
Electricity Fees $288 -
Natural Gas $2,644,248 226,896
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $833,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,242

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $413,866 $803,660 - - $413,866
-
MMBtu
- -
02 4.652: Replace existing equipment with more suitable substitutes $165,791 $85,600 - - $165,791
-
MMBtu
- -
03 4.132: Purchase new equipment to reduce material use / cost $97,378 $120,000 $(-6,440.0)
(-98,024)
kWh
$(-882.0)
-
kW-mo/yr
- - $104,700
04 2.2426: Use waste heat from flue gases to heat space conditioning air $75,243 $72,000 $(-371.0)
(-5,652)
kWh
$(-53.0)
-
kW-mo/yr
$75,667
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $17,098 $44,783 $15,335
233,405
kWh
$1,763
-
kW-mo/yr
- - -
06 2.1121: Use insulation in furnaces to facilitate heating / cooling $11,848 $3,759 - - $11,848
-
MMBtu
- -
07 2.4151: Develop a repair/replace policy $11,204 $793 $10,424
158,661
kWh
$1,500
-
kW-mo/yr
- $(-720.0) -
08 2.4156: Establish a preventative maintenance program $10,882 $1,000 $9,851
149,935
kWh
$1,421
-
kW-mo/yr
- $(-390.0) -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $5,891 $900 $5,180
78,840
kWh
$711
-
kW-mo/yr
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $5,120 - $4,501
68,504
kWh
$619
-
kW-mo/yr
- - -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,235 $419 $3,722
56,658
kWh
$513
-
kW-mo/yr
- - -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,839 $3,121 $3,352
51,021
kWh
$487
-
kW-mo/yr
- - -
13 2.4239: Eliminate or reduce compressed air usage $3,767 $75 $3,293
50,121
kWh
$474
-
kW-mo/yr
- - -
14 2.4221: Install compressor air intakes in coolest locations $3,089 $245 $2,714
41,310
kWh
$375
-
kW-mo/yr
- - -
15 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,030 - $1,773
26,984
kWh
$257
-
kW-mo/yr
- - -
16 2.2628: Utilize a less expensive cooling method $1,732 $1,075 $1,461
22,239
kWh
$271
-
kW-mo/yr
- - -
17 2.2625: Chill water to the highest temperature possible $606 $60 $527
8,015
kWh
$79
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $833,619 $1,137,490 $55,322
842,017
kWh
$7,535
-
kW-mo/yr
$667,172
-
MMBtu
$(-1,110.0) $104,700
TOTAL IMPLEMENTED $34,242 $3,112 $30,950
471,078
kWh
$4,402
-
kW-mo/yr
- $(-1,110.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs