Assessment Year | 2008 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
40,000
ft2
|
Annual Production | 18,000,000
units
|
Production Hrs. Annual | 2,678
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $369,024 | 12,451,472 |
kWh
|
$0.030 |
Electricity Demand | $265,701 | 30,526 |
kW-mo/yr
|
$8.70 |
Electricity Fees | $406 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $913,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,792 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Other Energy Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3414: Burn waste to produce steam to drive a steam turbine generator set and use steam exhaust for heat | $870,056 | $3,850,000 |
$201,660
6,812,832
kWh
|
$168,815
-
kW-mo/yr
|
$(-55,488.0)
-
MMBtu
|
$555,069
-
MMBtu
|
- | |
02 | 2.4157: Establish a predictive maintenance program | $16,386 | $3,500 |
$7,553
255,180
kWh
|
$9,948
-
kW-mo/yr
|
- | - | $(-1,115.0) | |
03 | 2.4151: Develop a repair/replace policy | $11,577 | $1,336 |
$5,035
170,114
kWh
|
$6,632
-
kW-mo/yr
|
- | - | $(-90.0) | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,511 | - |
$4,104
138,589
kWh
|
$5,407
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $2,892 | $485 |
$1,248
42,179
kWh
|
$1,644
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,538 | - |
$981
33,138
kWh
|
$557
-
kW-mo/yr
|
- | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $1,042 | $185 |
$554
18,713
kWh
|
$488
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $780 | $2,158 |
$336
11,352
kWh
|
$444
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $913,782 | $3,857,664 |
$221,471
7,482,097
kWh
|
$193,935
-
kW-mo/yr
|
$(-55,488.0)
-
MMBtu
|
$555,069
-
MMBtu
|
$(-1,205.0) | ||
TOTAL IMPLEMENTED | $39,792 | $6,994 |
$18,009
608,373
kWh
|
$22,988
-
kW-mo/yr
|
- | - | $(-1,205.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Other Energy Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs