Assessment Year | 2006 |
---|---|
Principal Product | Incandescent Lamp Products |
NAICS | 335121: Residential Electric Lighting Fixture Manufacturing |
SIC | 3645: Residential Electric Lighting Fixtures |
Sales Range | $100 M to 500M |
# of Employees | 401 |
Plant Area |
520,000
ft2
|
Annual Production | 500,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $647,790 | 27,470,798 |
kWh
|
$0.024 |
Electricity Demand | $407,019 | 47,713 |
kW-mo/yr
|
$8.53 |
Natural Gas | $1,714,379 | 171,617 |
MMBtu
|
$9.99 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $564,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $87,269 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1133: Adjust burners for efficient operation | $390,000 | $140,000 | - | - |
$390,000
-
MMBtu
|
- | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $38,402 | $8,000 | - |
$38,402
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,574 | $60,657 |
$21,875
918,260
kWh
|
$13,699
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $22,653 | $26,300 |
$8,118
340,759
kWh
|
$14,535
-
kW-mo/yr
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,346 | $2,805 |
$10,351
434,512
kWh
|
$5,295
-
kW-mo/yr
|
- | $(-300.0) | |
06 | 2.4157: Establish a predictive maintenance program | $14,670 | $1,000 |
$10,414
437,156
kWh
|
$5,323
-
kW-mo/yr
|
- | $(-1,067.0) | |
07 | 2.7314: Reduce ventilation air | $10,829 | $6,280 | - | - |
$10,829
-
MMBtu
|
- | |
08 | 2.4239: Eliminate or reduce compressed air usage | $9,402 | $1,000 |
$5,775
242,311
kWh
|
$3,627
-
kW-mo/yr
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $6,834 | $10,400 |
$4,139
173,712
kWh
|
$2,695
-
kW-mo/yr
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,809 | $49,405 |
$4,216
176,966
kWh
|
$2,593
-
kW-mo/yr
|
- | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,570 | - |
$3,685
154,704
kWh
|
$1,885
-
kW-mo/yr
|
- | - | |
12 | 2.4151: Develop a repair/replace policy | $5,468 | $800 |
$5,207
218,578
kWh
|
$2,661
-
kW-mo/yr
|
- | $(-2,400.0) | |
13 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $3,389 | $6,500 |
$2,527
106,066
kWh
|
$862
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $564,946 | $313,147 |
$76,307
3,203,024
kWh
|
$91,577
-
kW-mo/yr
|
$400,829
-
MMBtu
|
$(-3,767.0) | ||
TOTAL IMPLEMENTED | $87,269 | $115,667 |
$57,838
2,427,783
kWh
|
$33,198
-
kW-mo/yr
|
- | $(-3,767.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |