ITAC Assessment: WV0337
ITAC logo
ITAC Assessment: WV0337
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Customized Injection Molded Plastics
NAICS 333511: Industrial Mold Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 100,000
ft2
Annual Production 7,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $471,424 8,873,100
kWh
Electricity Demand $111,945 17,322
kW-mo/yr
Electricity Fees $32,322 -
Natural Gas $12,725 1,099
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $96,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,616

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $64,554 $123,600 $52,584
926,532
kWh
$11,970
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $5,455 $800 $5,455
96,000
kWh
- - -
03 2.2511: Insulate bare equipment $5,170 $2,156 $3,975
70,027
kWh
$1,195
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,690 - $3,824
67,344
kWh
$866
-
kW-mo/yr
- -
05 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,170 $2,350 - - $3,170
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $2,233 $760 $2,601
45,708
kWh
$592
-
kW-mo/yr
- $(-960.0)
07 2.4221: Install compressor air intakes in coolest locations $2,082 $590 $1,696
29,886
kWh
$386
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,981 $80 $1,613
28,354
kWh
$368
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,846 $2,185 $1,846
32,535
kWh
- - -
10 2.4314: Use synthetic lubricant $1,777 - $1,480
26,077
kWh
$337
-
kW-mo/yr
- $(-40.0)
11 2.7241: Install outside air damper / economizer on hvac unit $1,749 $2,400 $1,264
22,268
kWh
$485
-
kW-mo/yr
- -
12 2.2628: Utilize a less expensive cooling method $1,100 $1,308 $896
15,784
kWh
$204
-
kW-mo/yr
- -
13 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $674 $1,280 $615
10,787
kWh
$139
-
kW-mo/yr
- $(-80.0)
TOTAL RECOMMENDED $96,481 $137,509 $77,849
1,371,302
kWh
$16,542
-
kW-mo/yr
$3,170
-
MMBtu
$(-1,080.0)
TOTAL IMPLEMENTED $88,616 $129,266 $73,843
1,300,715
kWh
$15,853
-
kW-mo/yr
- $(-1,080.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs