ITAC Assessment: WV0333
ITAC logo
ITAC Assessment: WV0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Hardwood Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 22,500
ft2
Annual Production 25,000,000
units
Production Hrs. Annual 5,062
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,224 4,692,600
kWh
Electricity Demand $104,696 11,643
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,965 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 3.6124: Burn waste oil for heat $23,934 $19,500 $8,296
410,022
kWh
$8,738
-
kW-mo/yr
$(-300.0) $7,200
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,663 $195 $2,295
113,287
kWh
$2,418
-
kW-mo/yr
$(-50.0) -
03 2.4151: Develop a repair/replace policy $2,692 $544 $1,604
79,110
kWh
$1,688
-
kW-mo/yr
$(-600.0) -
04 2.4239: Eliminate or reduce compressed air usage $1,819 $800 $884
43,657
kWh
$935
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $397 $210 $397
19,626
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $460 - $226
11,176
kWh
$234
-
kW-mo/yr
- -
TOTAL RECOMMENDED $33,965 $21,249 $13,702
676,878
kWh
$14,013
-
kW-mo/yr
$(-950.0) $7,200
TOTAL IMPLEMENTED $9,174 $1,539 $4,783
236,054
kWh
$5,041
-
kW-mo/yr
$(-650.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs