Assessment Year | 2005 |
---|---|
Principal Product | Steel Bar Grating and Steel Wire |
NAICS | 331222: Steel Wire Drawing |
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
112,757
ft2
|
Annual Production | 36,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,782 | 1,706,629 |
kWh
|
$0.031 |
Electricity Demand | $21,065 | 6,521 |
kW-mo/yr
|
$3.23 |
Electricity Fees | $49,456 | - |
|
- |
Natural Gas | $48,614 | 4,881 |
MMBtu
|
$9.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,393 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,322 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,560 | $110 |
$8,138
152,623
kWh
|
$1,422
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,364 | $3,520 |
$4,060
65,635
kWh
|
$304
-
kW-mo/yr
|
- | - | |
03 | 2.7492: Use proper thickness of insulation on building envelope | $3,526 | $714 | - | - |
$3,526
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $3,098 | $382 | - | - |
$3,098
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,298 | - |
$2,208
33,634
kWh
|
$90
-
kW-mo/yr
|
- | - | |
06 | 2.4314: Use synthetic lubricant | $2,037 | $124 |
$1,734
32,523
kWh
|
$303
-
kW-mo/yr
|
- | - | |
07 | 2.4151: Develop a repair/replace policy | $1,350 | $72 |
$1,287
23,733
kWh
|
$207
-
kW-mo/yr
|
- | $(-144.0) | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,329 | - |
$1,193
20,500
kWh
|
$136
-
kW-mo/yr
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,156 | $4,132 |
$1,122
16,701
kWh
|
$34
-
kW-mo/yr
|
- | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $835 | $180 |
$797
12,285
kWh
|
$38
-
kW-mo/yr
|
- | - | |
11 | 4.652: Replace existing equipment with more suitable substitutes | $99,840 | $150,768 | - | - | - | $99,840 | |
TOTAL RECOMMENDED | $129,393 | $160,002 |
$20,539
357,634
kWh
|
$2,534
-
kW-mo/yr
|
$6,624
-
MMBtu
|
$99,696 | ||
TOTAL IMPLEMENTED | $23,322 | $8,672 |
$17,534
311,715
kWh
|
$2,406
-
kW-mo/yr
|
$3,526
-
MMBtu
|
$(-144.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs