ITAC Assessment: LE0260
ITAC logo
ITAC Assessment: LE0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Fluid Power Products
NAICS 333996: Fluid Power Pump and Motor Manufacturing
SIC 3594: Fluid Power Pumps and Motors
Sales Range $50
M
to 100
M
# of Employees 123
Plant Area 75,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $103,074 1,586,200
kWh
Electricity Demand $38,007 4,264
kW-mo/yr
Natural Gas $22,727 1,681
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $120,968 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7232: Replace existing hvac unit with high efficiency model $67,607 $74,000 $16,848
259,200
kWh
$4,491
-
kW-mo/yr
$46,268
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $11,871 $60 $9,395
144,531
kWh
$2,476
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,263 $1,000 $4,957
76,259
kWh
$1,306
-
kW-mo/yr
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,657 $8,000 - $4,657
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $3,696 $1,350 $3,696
56,861
kWh
- - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,799 $2,500 - - - $2,799
-
lb
07 3.4151: Minimize water usage $1,524 $1,000 $134
2,958
kWh
$1,390
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $816 $200 $614
9,433
kWh
$202
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $234 $500 $161
2,471
kWh
$73
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $21,501 $54,052 $17,016
261,784
kWh
$4,485
-
kW-mo/yr
- -
TOTAL RECOMMENDED $120,968 $142,662 $52,821
813,497
kWh
$19,080
-
kW-mo/yr
$46,268
-
MMBtu
$2,799
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs