Assessment Year | 2004 |
---|---|
Principal Product | Bronze and Al castings |
NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 22 |
Plant Area |
25,000
ft2
|
Annual Production | 1,500,000
pieces
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,385 | 1,816,800 |
kWh
|
$0.043 |
Electricity Demand | $90,610 | 12,079 |
kW-mo/yr
|
$7.50 |
Natural Gas | $97,106 | 11,395 |
MMBtu
|
$8.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,989 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6124: Establish equipment maintenance schedule | $43,287 | $120 | - | - |
$43,287
-
MMBtu
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $21,546 | - | - |
$21,546
-
kW-mo/yr
|
- | - | - | |
03 | 2.2511: Insulate bare equipment | $3,815 | $2,707 | - | - |
$3,815
-
MMBtu
|
- | - | |
04 | 2.2414: Use waste heat from hot flue gases to preheat | $1,328 | $1,525 | - | - |
$1,328
-
MMBtu
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,317 | $630 |
$762
15,236
kWh
|
$555
-
kW-mo/yr
|
- | - | - | |
06 | 2.2514: Cover open tanks | $1,229 | $2,250 | - | - |
$1,229
-
MMBtu
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,212 | $300 |
$657
15,294
kWh
|
$555
-
kW-mo/yr
|
- | - | - | |
08 | 4.123: Reduce defects by reducing product tipping | $30,991 | $1,500 | - | - |
$991
-
MMBtu
|
- | $30,000 | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $775 | $60 |
$775
9,734
kWh
|
- | - | - | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $654 | $210 |
$354
8,206
kWh
|
$300
-
kW-mo/yr
|
- | - | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $604 | $1,000 | - | - |
$604
-
MMBtu
|
- | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $396 | - |
$214
4,999
kWh
|
$182
-
kW-mo/yr
|
- | - | - | |
13 | 2.4221: Install compressor air intakes in coolest locations | $281 | $150 |
$152
3,535
kWh
|
$129
-
kW-mo/yr
|
- | - | - | |
14 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $245 | $165 |
$328
7,618
kWh
|
$277
-
kW-mo/yr
|
- | $(-360.0) | - | |
TOTAL RECOMMENDED | $107,680 | $10,617 |
$3,242
64,622
kWh
|
$23,544
-
kW-mo/yr
|
$51,254
-
MMBtu
|
$(-360.0) | $30,000 | ||
TOTAL IMPLEMENTED | $8,989 | $6,112 |
$2,736
52,881
kWh
|
$1,569
-
kW-mo/yr
|
$5,044
-
MMBtu
|
$(-360.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs