| Assessment Year | 1982 |
|---|---|
| Principal Product | PLASTIC CONTAINERS |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $154,700 | 4,149,473 |
kWh
|
$0.037 |
| Natural Gas | $17,005 | 5,515 |
MMBtu
|
$3.08 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $37,358 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,115 | $140 |
$6,115
213,365
kWh
|
- | |
| 02 | 2.7261: Install timers and/or thermostats | $5,398 | $100 |
$3,218
112,251
kWh
|
$2,180
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $644 | $100 | - |
$644
-
MMBtu
|
|
| 04 | 2.7221: Lower temperature during the winter season and vice-versa | $4,457 | - | - |
$4,457
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,550 | $7,500 |
$3,550
106,389
kWh
|
- | |
| 06 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $258 | - |
$258
5,862
kWh
|
- | |
| 07 | 2.7494: Install storm windows and doors | $449 | $572 |
$193
6,741
kWh
|
$256
-
MMBtu
|
|
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $13,226 | $17,775 |
$13,226
395,369
kWh
|
- | |
| 09 | 2.7226: Use computer programs to optimize hvac performance | $3,261 | $4,000 |
$3,261
113,716
kWh
|
- | |
| TOTAL RECOMMENDED | $37,358 | $30,187 |
$29,821
953,693
kWh
|
$7,537
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs