| Assessment Year | 2003 |
|---|---|
| Principal Product | Packaging Material |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 190 |
| Plant Area |
125,000
ft2
|
| Annual Production | 500,000
thousand feet
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $591,424 | 10,915,600 |
kWh
|
$0.054 |
| Natural Gas | $496,588 | 84,275 |
MMBtu
|
$5.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $99,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $47,717 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $2,890 | $470 |
$2,890
53,326
kWh
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,113 | $200 |
$4,113
75,887
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $5,690 | $608 | - |
$5,690
-
MMBtu
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $858 | $250 |
$858
15,815
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,528 | - |
$2,528
46,638
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,374 | $23,821 |
$19,374
357,533
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $4,081 | $230 |
$4,081
75,213
kWh
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $3,716 | $350 |
$3,716
68,562
kWh
|
- | - | |
| 09 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,656 | $690 |
$20,208
372,989
kWh
|
- | $(-552.0) | |
| 10 | 2.2437: Recover waste heat from equipment | $36,459 | $6,156 | - |
$36,459
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $99,365 | $32,775 |
$57,768
1,065,963
kWh
|
$42,149
-
MMBtu
|
$(-552.0) | ||
| TOTAL IMPLEMENTED | $47,717 | $25,311 |
$48,269
890,786
kWh
|
- | $(-552.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs