| Assessment Year | 2003 |
|---|---|
| Principal Product | Al-Li Alloys |
| NAICS | 331313: Alumina Refining and Primary Aluminum Production |
| SIC | 3353: Aluminum Sheet, Plate, and Foil |
| Sales Range | n/a |
| # of Employees | 650 |
| Plant Area |
1,100,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $774,003 | 43,790,714 |
kWh
|
$0.018 |
| Electricity Demand | $518,576 | 83,525 |
kW-mo/yr
|
$6.21 |
| Electricity Fees | $386,576 | - |
|
- |
| Natural Gas | $1,161,104 | 193,296 |
MMBtu
|
$6.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $380,783 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $148,925 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $10,914 | $1,100 |
$4,965
187,227
kWh
|
$5,949
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,020 | - |
$465
17,490
kWh
|
$555
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $61,834 | $281,530 |
$28,120
1,060,380
kWh
|
$33,714
-
kW-mo/yr
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $18,309 | $36,855 |
$8,329
314,096
kWh
|
$9,980
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,497 | $335 |
$1,889
71,199
kWh
|
$608
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,738 | $220 |
$2,829
106,652
kWh
|
$909
-
kW-mo/yr
|
- | - | |
| 07 | 2.2437: Recover waste heat from equipment | $10,524 | $1,620 | - | - |
$10,524
-
MMBtu
|
- | |
| 08 | 2.2414: Use waste heat from hot flue gases to preheat | $159,962 | $19,820 | - | - |
$159,962
-
MMBtu
|
- | |
| 09 | 2.1233: Analyze flue gas for proper air/fuel ratio | $37,016 | $1,000 | - | - |
$37,016
-
MMBtu
|
- | |
| 10 | 2.2437: Recover waste heat from equipment | $47,961 | $101,667 |
$26,659
1,005,283
kWh
|
$21,302
-
kW-mo/yr
|
- | - | |
| 11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,974 | $6,300 |
$2,719
102,550
kWh
|
$3,255
-
kW-mo/yr
|
- | - | |
| 12 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,542 | $1,375 |
$10,281
387,639
kWh
|
$10,581
-
kW-mo/yr
|
- | $(-1,320.0) | |
| 13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $538 | $2,900 |
$256
9,824
kWh
|
$282
-
kW-mo/yr
|
- | - | |
| 14 | 2.2625: Chill water to the highest temperature possible | $954 | $110 |
$458
17,287
kWh
|
$496
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $380,783 | $454,832 |
$86,970
3,279,627
kWh
|
$87,631
-
kW-mo/yr
|
$207,502
-
MMBtu
|
$(-1,320.0) | ||
| TOTAL IMPLEMENTED | $148,925 | $330,290 |
$53,457
2,015,918
kWh
|
$59,772
-
kW-mo/yr
|
$37,016
-
MMBtu
|
$(-1,320.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs