ITAC Assessment: WV0249
ITAC logo
ITAC Assessment: WV0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Paper Bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 200,000
ft2
Annual Production 36,000
ton
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,831 5,341,784
kWh
Electricity Fees $10,845 -
Natural Gas $27,352 6,322
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,569

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.2515: Use optimum thickness insulation $5,252 $1,650 - $5,252
-
MMBtu
- - - -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $5,366 $440 $5,894
132,436
kWh
- - - $(-528.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,995 $7,711 $1,995
44,938
kWh
- - - - -
04 2.7111: Reduce illumination to minimum necessary levels $5,868 $550 $5,868
131,947
kWh
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $6,077 $88 $6,077
136,538
kWh
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $3,390 $268 $3,390
76,180
kWh
- - - - -
07 2.4235: Remove or close off unneeded compressed air lines $926 $660 $926
20,740
kWh
- - - - -
08 2.4239: Eliminate or reduce compressed air usage $4,799 $200 $4,799
107,957
kWh
- - - - -
09 2.7135: Install occupancy sensors $535 $750 $535
12,013
kWh
- - - - -
10 2.4231: Reduce the pressure of compressed air to the minimum required $1,191 $2,460 - $1,191
-
MMBtu
- - - -
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $600 $1,240 - - $600
-
gal
- - -
12 3.5248: Separate and recycle scrap metal to foundry or for sale $672 $200 - - - $672
-
lb
- -
13 4.441: Install automatic packing equipment $67,320 $55,000 - - - - - $67,320
TOTAL RECOMMENDED $103,991 $71,217 $29,484
662,749
kWh
$6,443
-
MMBtu
$600
-
gal
$672
-
lb
$(-528.0) $67,320
TOTAL IMPLEMENTED $28,569 $3,878 $23,173
520,891
kWh
$5,252
-
MMBtu
- $672
-
lb
$(-528.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs