ITAC Assessment: WV0248
ITAC logo
ITAC Assessment: WV0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Plastic Buckets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 53,058
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,450 7,126,800
kWh
Electricity Demand $198,290 13,629
kW-mo/yr
Natural Gas $24,450 2,943
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,103 $140 $697
19,390
kWh
$406
-
kW-mo/yr
- - - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $934 $34 $591
16,408
kWh
$343
-
kW-mo/yr
- - - - -
03 2.2515: Use optimum thickness insulation $5,194 $840 - - $5,194
-
MMBtu
- - - -
04 2.2511: Insulate bare equipment $10,209 $316 $6,452
179,023
kWh
$3,757
-
kW-mo/yr
- - - - -
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,097 $340 $9,166
254,324
kWh
$5,339
-
kW-mo/yr
- - - $(-408.0) -
06 2.7135: Install occupancy sensors $1,454 $600 $919
25,498
kWh
$535
-
kW-mo/yr
- - - - -
07 2.7111: Reduce illumination to minimum necessary levels $7,421 $850 $4,689
130,063
kWh
$2,732
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $534 $1,660 $167
4,696
kWh
$367
-
kW-mo/yr
- - - - -
09 2.2614: Use cooling tower or economizer to replace chiller cooling $14,002 - $10,856
301,286
kWh
$3,146
-
kW-mo/yr
- - - - -
10 3.4116: Meter recycled water (to reduce sewer charges) $8,295 - - - - $8,295
-
Tgal
- - -
11 3.1191: Change procedures / equipment / operating conditions $233 $34 - - - - $233
-
lb
- -
12 4.521: Clear and rent existing space $4,000 $670 - - - - - - $4,000
TOTAL RECOMMENDED $67,476 $5,484 $33,537
930,688
kWh
$16,625
-
kW-mo/yr
$5,194
-
MMBtu
$8,295
-
Tgal
$233
-
lb
$(-408.0) $4,000
TOTAL IMPLEMENTED $52,371 $5,344 $21,984
610,012
kWh
$13,073
-
kW-mo/yr
$5,194
-
MMBtu
$8,295
-
Tgal
$233
-
lb
$(-408.0) $4,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs