Assessment Year | 2002 |
---|---|
Principal Product | Plastic Buckets |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
53,058
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,450 | 7,126,800 |
kWh
|
$0.039 |
Electricity Demand | $198,290 | 13,629 |
kW-mo/yr
|
$14.55 |
Natural Gas | $24,450 | 2,943 |
MMBtu
|
$8.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,371 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,103 | $140 |
$697
19,390
kWh
|
$406
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $934 | $34 |
$591
16,408
kWh
|
$343
-
kW-mo/yr
|
- | - | - | - | - | |
03 | 2.2515: Use optimum thickness insulation | $5,194 | $840 | - | - |
$5,194
-
MMBtu
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $10,209 | $316 |
$6,452
179,023
kWh
|
$3,757
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,097 | $340 |
$9,166
254,324
kWh
|
$5,339
-
kW-mo/yr
|
- | - | - | $(-408.0) | - | |
06 | 2.7135: Install occupancy sensors | $1,454 | $600 |
$919
25,498
kWh
|
$535
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $7,421 | $850 |
$4,689
130,063
kWh
|
$2,732
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $534 | $1,660 |
$167
4,696
kWh
|
$367
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $14,002 | - |
$10,856
301,286
kWh
|
$3,146
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 3.4116: Meter recycled water (to reduce sewer charges) | $8,295 | - | - | - | - |
$8,295
-
Tgal
|
- | - | - | |
11 | 3.1191: Change procedures / equipment / operating conditions | $233 | $34 | - | - | - | - |
$233
-
lb
|
- | - | |
12 | 4.521: Clear and rent existing space | $4,000 | $670 | - | - | - | - | - | - | $4,000 | |
TOTAL RECOMMENDED | $67,476 | $5,484 |
$33,537
930,688
kWh
|
$16,625
-
kW-mo/yr
|
$5,194
-
MMBtu
|
$8,295
-
Tgal
|
$233
-
lb
|
$(-408.0) | $4,000 | ||
TOTAL IMPLEMENTED | $52,371 | $5,344 |
$21,984
610,012
kWh
|
$13,073
-
kW-mo/yr
|
$5,194
-
MMBtu
|
$8,295
-
Tgal
|
$233
-
lb
|
$(-408.0) | $4,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs