ITAC Assessment: AM0679
ITAC logo
ITAC Assessment: AM0679
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Deck and rail boards, ramps
NAICS 332323: Ornamental and Architectural Metal Work Manufacturing
SIC 3446: Architectural and Ornamental Metal Work
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 54,000
ft2
Annual Production 7,000
pieces
Production Hrs. Annual 6,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,855 822,720
kWh
Electricity Demand $24,046 2,997
kW-mo/yr
Electricity Fees $369 -
Natural Gas $11,578 1,457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $16,000 $4,040 - - $16,000
02 2.3212: Optimize plant power factor $5,340 $6,060 - $5,340
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,670 $200 $2,080
36,500
kWh
$590
-
kW-mo/yr
-
04 2.7124: Make a practice of turning off lights when not needed $1,350 - $1,350
23,700
kWh
- -
05 2.4226: Use / purchase optimum sized compressor $1,120 - $1,120
19,800
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,100 $2,160 $700
12,170
kWh
$400
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $120 $290 $100
1,750
kWh
$20
-
kW-mo/yr
-
08 2.6218: Turn off equipment when not in use $340 - $340
5,940
kWh
- -
09 2.4239: Eliminate or reduce compressed air usage $100 $390 $100
1,800
kWh
- -
TOTAL RECOMMENDED $28,140 $13,140 $5,790
101,660
kWh
$6,350
-
kW-mo/yr
$16,000
TOTAL IMPLEMENTED $22,690 $10,100 $1,350
23,700
kWh
$5,340
-
kW-mo/yr
$16,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs