Assessment Year | 2015 |
---|---|
Principal Product | Deck and rail boards, ramps |
NAICS | 332323: Ornamental and Architectural Metal Work Manufacturing |
SIC | 3446: Architectural and Ornamental Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 52 |
Plant Area |
54,000
ft2
|
Annual Production | 7,000
pieces
|
Production Hrs. Annual | 6,250
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $45,855 | 822,720 |
kWh
|
$0.056 |
Electricity Demand | $24,046 | 2,997 |
kW-mo/yr
|
$8.02 |
Electricity Fees | $369 | - |
|
- |
Natural Gas | $11,578 | 1,457 |
MMBtu
|
$7.95 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,140 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,690 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $16,000 | $4,040 | - | - | $16,000 | |
02 | 2.3212: Optimize plant power factor | $5,340 | $6,060 | - |
$5,340
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,670 | $200 |
$2,080
36,500
kWh
|
$590
-
kW-mo/yr
|
- | |
04 | 2.7124: Make a practice of turning off lights when not needed | $1,350 | - |
$1,350
23,700
kWh
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $1,120 | - |
$1,120
19,800
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,100 | $2,160 |
$700
12,170
kWh
|
$400
-
kW-mo/yr
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $120 | $290 |
$100
1,750
kWh
|
$20
-
kW-mo/yr
|
- | |
08 | 2.6218: Turn off equipment when not in use | $340 | - |
$340
5,940
kWh
|
- | - | |
09 | 2.4239: Eliminate or reduce compressed air usage | $100 | $390 |
$100
1,800
kWh
|
- | - | |
TOTAL RECOMMENDED | $28,140 | $13,140 |
$5,790
101,660
kWh
|
$6,350
-
kW-mo/yr
|
$16,000 | ||
TOTAL IMPLEMENTED | $22,690 | $10,100 |
$1,350
23,700
kWh
|
$5,340
-
kW-mo/yr
|
$16,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs