| Assessment Year | 2002 |
|---|---|
| Principal Product | Ice Cream |
| NAICS |
n/a
|
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $100 M to 500M |
| # of Employees | 300 |
| Plant Area |
145,000
ft2
|
| Annual Production | 11,000
Tgal
|
| Production Hrs. Annual | 5,500
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $813,354 | 25,386,900 |
kWh
|
$0.032 |
| Natural Gas | $94,131 | 13,068 |
MMBtu
|
$7.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $106,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $64,673 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,136 | $108 |
$5,136
160,271
kWh
|
- | - | - | - | - | |
| 02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $19,433 | $900 |
$19,757
616,472
kWh
|
- | - | - | $(-324.0) | - | |
| 03 | 2.2511: Insulate bare equipment | $1,318 | $193 | - |
$1,318
-
MMBtu
|
- | - | - | - | |
| 04 | 2.7144: Install spectral reflectors / delamp | $3,380 | $4,950 |
$3,380
105,600
kWh
|
- | - | - | - | - | |
| 05 | 2.4226: Use / purchase optimum sized compressor | $2,244 | $19,144 |
$2,244
70,027
kWh
|
- | - | - | - | - | |
| 06 | 2.2441: Preheat boiler makeup water with waste process heat | $9,994 | $10,000 | - |
$9,994
-
MMBtu
|
- | - | - | - | |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $9,266 | $4,270 | - |
$9,266
-
MMBtu
|
- | - | - | - | |
| 08 | 3.4155: Meter waste water | $29,520 | $944 | - | - |
$29,520
-
Tgal
|
- | - | - | |
| 09 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $13,076 | $4,000 | - | - | - |
$13,076
-
lb
|
- | - | |
| 10 | 4.652: Replace existing equipment with more suitable substitutes | $13,200 | $11,000 | - | - | - | - | - | $13,200 | |
| TOTAL RECOMMENDED | $106,567 | $55,509 |
$30,517
952,370
kWh
|
$20,578
-
MMBtu
|
$29,520
-
Tgal
|
$13,076
-
lb
|
$(-324.0) | $13,200 | ||
| TOTAL IMPLEMENTED | $64,673 | $6,415 |
$24,893
776,743
kWh
|
$10,584
-
MMBtu
|
$29,520
-
Tgal
|
- | $(-324.0) | - | ||