ITAC Assessment: WV0244
ITAC logo
ITAC Assessment: WV0244
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Ice Cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 145,000
ft2
Annual Production 11,000
Tgal
Production Hrs. Annual 5,500
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $813,354 25,386,900
kWh
Natural Gas $94,131 13,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,567 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,673

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,136 $108 $5,136
160,271
kWh
- - - - -
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $19,433 $900 $19,757
616,472
kWh
- - - $(-324.0) -
03 2.2511: Insulate bare equipment $1,318 $193 - $1,318
-
MMBtu
- - - -
04 2.7144: Install spectral reflectors / delamp $3,380 $4,950 $3,380
105,600
kWh
- - - - -
05 2.4226: Use / purchase optimum sized compressor $2,244 $19,144 $2,244
70,027
kWh
- - - - -
06 2.2441: Preheat boiler makeup water with waste process heat $9,994 $10,000 - $9,994
-
MMBtu
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $9,266 $4,270 - $9,266
-
MMBtu
- - - -
08 3.4155: Meter waste water $29,520 $944 - - $29,520
-
Tgal
- - -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $13,076 $4,000 - - - $13,076
-
lb
- -
10 4.652: Replace existing equipment with more suitable substitutes $13,200 $11,000 - - - - - $13,200
TOTAL RECOMMENDED $106,567 $55,509 $30,517
952,370
kWh
$20,578
-
MMBtu
$29,520
-
Tgal
$13,076
-
lb
$(-324.0) $13,200
TOTAL IMPLEMENTED $64,673 $6,415 $24,893
776,743
kWh
$10,584
-
MMBtu
$29,520
-
Tgal
- $(-324.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs