ITAC Assessment: WV0243
ITAC logo
ITAC Assessment: WV0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Hydrogen Peroxide
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 81
Plant Area 54,600
ft2
Annual Production 82,000,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,012,672 32,496,000
kWh
Natural Gas $182,077 48,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.7135: Install occupancy sensors $520 $150 $520
16,701
kWh
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $38,997 $220 $39,657
1,253,258
kWh
- - $(-660.0) -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $38,007 $550 $38,007
1,240,855
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,642 $2,800 $1,642
48,996
kWh
- - - -
05 2.2135: Repair and eliminate steam leaks $45,099 $1,050 - $45,099
-
MMBtu
- - -
06 2.7134: Use photocell controls $1,799 $1,500 $1,799
57,721
kWh
- - - -
07 2.2511: Insulate bare equipment $2,317 $777 - $2,317
-
MMBtu
- - -
08 3.4111: Use closed cycle process to minimize waste water production $8,000 $9,750 - - $8,000
-
Tgal
- -
09 3.4151: Minimize water usage $8,228 $10,000 - - $8,228
-
Tgal
- -
10 4.422: Utilize outside contracting $87,058 $1,100 - - - - $87,058
TOTAL RECOMMENDED $231,667 $27,897 $81,625
2,617,531
kWh
$47,416
-
MMBtu
$16,228
-
Tgal
$(-660.0) $87,058
TOTAL IMPLEMENTED $124,940 $2,747 $78,184
2,510,814
kWh
$47,416
-
MMBtu
- $(-660.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs