Assessment Year | 2002 |
---|---|
Principal Product | Hydrogen Peroxide |
NAICS |
n/a
|
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 81 |
Plant Area |
54,600
ft2
|
Annual Production | 82,000,000
lb
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,012,672 | 32,496,000 |
kWh
|
$0.031 |
Natural Gas | $182,077 | 48,169 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $231,667 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $124,940 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $520 | $150 |
$520
16,701
kWh
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $38,997 | $220 |
$39,657
1,253,258
kWh
|
- | - | $(-660.0) | - | |
03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $38,007 | $550 |
$38,007
1,240,855
kWh
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,642 | $2,800 |
$1,642
48,996
kWh
|
- | - | - | - | |
05 | 2.2135: Repair and eliminate steam leaks | $45,099 | $1,050 | - |
$45,099
-
MMBtu
|
- | - | - | |
06 | 2.7134: Use photocell controls | $1,799 | $1,500 |
$1,799
57,721
kWh
|
- | - | - | - | |
07 | 2.2511: Insulate bare equipment | $2,317 | $777 | - |
$2,317
-
MMBtu
|
- | - | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $8,000 | $9,750 | - | - |
$8,000
-
Tgal
|
- | - | |
09 | 3.4151: Minimize water usage | $8,228 | $10,000 | - | - |
$8,228
-
Tgal
|
- | - | |
10 | 4.422: Utilize outside contracting | $87,058 | $1,100 | - | - | - | - | $87,058 | |
TOTAL RECOMMENDED | $231,667 | $27,897 |
$81,625
2,617,531
kWh
|
$47,416
-
MMBtu
|
$16,228
-
Tgal
|
$(-660.0) | $87,058 | ||
TOTAL IMPLEMENTED | $124,940 | $2,747 |
$78,184
2,510,814
kWh
|
$47,416
-
MMBtu
|
- | $(-660.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs