Assessment Year | 2002 |
---|---|
Principal Product | Envelopes |
NAICS |
n/a
|
SIC | 2677: Envelopes |
Sales Range | $100 M to 500M |
# of Employees | 848 |
Plant Area |
380,000
ft2
|
Annual Production | 6,000,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $346,421 | 19,651,200 |
kWh
|
$0.018 |
Electricity Demand | $246,635 | 39,824 |
kW-mo/yr
|
$6.19 |
Natural Gas | $89,412 | 7,763 |
MMBtu
|
$11.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $154,003 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $73,638 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,180 | $4,900 |
$8,540
305,892
kWh
|
$3,640
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.2628: Utilize a less expensive cooling method | $826 | $585 |
$581
47,847
kWh
|
$245
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2622: Replace existing chiller with high efficiency model | $29,035 | $44,954 |
$20,344
728,691
kWh
|
$8,691
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,403 | $124 |
$985
35,226
kWh
|
$418
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $37,820 | $422 | - | - |
$37,820
-
MMBtu
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,340 | $84 |
$5,146
184,340
kWh
|
$2,194
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7144: Install spectral reflectors / delamp | $1,206 | $3,600 |
$564
20,218
kWh
|
$642
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7135: Install occupancy sensors | $1,272 | $750 |
$892
31,937
kWh
|
$380
-
kW-mo/yr
|
- | - | - | - | |
09 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,994 | $560 |
$9,233
330,211
kWh
|
$3,929
-
kW-mo/yr
|
- | - | $(-168.0) | - | |
10 | 2.2437: Recover waste heat from equipment | $8,237 | $2,163 | - | - |
$8,237
-
MMBtu
|
- | - | - | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,850 | $1,537 | - | - | - |
$5,850
-
gal
|
- | - | |
12 | 4.445: Install equipment to move product | $21,840 | $13,000 | - | - | - | - | - | $21,840 | |
13 | 4.652: Replace existing equipment with more suitable substitutes | $14,000 | $6,000 | - | - | - | - | - | $14,000 | |
TOTAL RECOMMENDED | $154,003 | $78,679 |
$46,285
1,684,362
kWh
|
$20,139
-
kW-mo/yr
|
$46,057
-
MMBtu
|
$5,850
-
gal
|
$(-168.0) | $35,840 | ||
TOTAL IMPLEMENTED | $73,638 | $10,901 |
$24,956
920,445
kWh
|
$11,030
-
kW-mo/yr
|
$37,820
-
MMBtu
|
- | $(-168.0) | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs