Assessment Year | 2000 |
---|---|
Principal Product | Carbonated Beverages |
NAICS |
n/a
|
SIC | 2032: Canned Specialties |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
168,164
ft2
|
Annual Production | 3,600,000
units
|
Production Hrs. Annual | 3,570
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $268,476 | 2,417,462 |
kWh
|
$0.11 |
Natural Gas | $30,613 | 5,116 |
MMBtu
|
$5.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,856 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,949 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $8,181 | $8,239 |
$8,181
102,440
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $9,998 | $7,800 |
$9,998
94,491
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $807 | $1,711 |
$807
12,895
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,491 | $2,520 |
$1,491
13,227
kWh
|
- | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $8,916 | $14,480 |
$8,916
59,619
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,102 | $36,670 |
$9,102
75,951
kWh
|
- | - | |
07 | 3.4151: Minimize water usage | $23,452 | $125,000 | - |
$23,452
-
lb
|
- | |
08 | 2.8114: Change rate schedules or other changes in utility service | $31,909 | $130,000 | - | - | $31,909 | |
TOTAL RECOMMENDED | $93,856 | $326,420 |
$38,495
358,623
kWh
|
$23,452
-
lb
|
$31,909 | ||
TOTAL IMPLEMENTED | $51,949 | $188,620 |
$28,497
264,132
kWh
|
$23,452
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs