Assessment Year | 2000 |
---|---|
Principal Product | Corrugated Paperboard |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 53 |
Plant Area |
72,000
ft2
|
Annual Production | 300,000
thousand feet
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,076 | 1,706,038 |
kWh
|
$0.062 |
Natural Gas | $77,550 | 21,596 |
MMBtu
|
$3.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,545 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,269 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $6,939 | $3,252 | - |
$6,939
-
MMBtu
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $808 | $275 | - |
$808
-
MMBtu
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $937 | $500 | - |
$937
-
MMBtu
|
- | - | |
04 | 2.2113: Repair or replace steam traps | $2,348 | $1,368 | - |
$2,348
-
MMBtu
|
- | - | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $4,494 | $664 |
$4,494
72,978
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $531 | $154 |
$531
8,499
kWh
|
- | - | - | |
07 | 2.7144: Install spectral reflectors / delamp | $908 | $912 |
$908
14,654
kWh
|
- | - | - | |
08 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $4,000 | $863 | - | - |
$4,000
-
lb
|
- | |
09 | 3.5316: Contract a wood pallet recycling company | $2,880 | $100 | - | - |
$2,880
-
lb
|
- | |
10 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $2,000 | $400 | - | - |
$2,000
-
lb
|
- | |
11 | 4.621: Use fixtures to reduce machine changeout times | $11,700 | $500 | - | - | - | $11,700 | |
TOTAL RECOMMENDED | $37,545 | $8,988 |
$5,933
96,131
kWh
|
$11,032
-
MMBtu
|
$8,880
-
lb
|
$11,700 | ||
TOTAL IMPLEMENTED | $35,269 | $8,059 |
$5,402
87,632
kWh
|
$9,287
-
MMBtu
|
$8,880
-
lb
|
$11,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs