ITAC Assessment: OK0862
ITAC logo
ITAC Assessment: OK0862
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Air Filtration Systems
NAICS 333413: Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 280,000
ft2
Annual Production 4,200
units
Production Hrs. Annual 4,500
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $231,508 5,287,563
kWh
Electricity Demand $58,406 13,125
kW-mo/yr
Natural Gas $131,279 20,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,733

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $2,733 - - - $2,733
02 2.7142: Utilize higher efficiency lamps and/or ballasts $14,745 $52,650 $11,600
264,870
kWh
$3,145
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $3,000 $2,520 $3,000
68,580
kWh
- -
04 2.3132: Recharge batteries on during off-peak demand periods $600 - - $600
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,426 $53,400 $10,565
241,200
kWh
$2,861
-
kW-mo/yr
-
06 2.4323: Use optimum size and capacity equipment $2,177 $8,000 $1,790
40,874
kWh
$387
-
kW-mo/yr
-
07 2.4323: Use optimum size and capacity equipment $7,599 $12,000 $6,095
139,163
kWh
$1,504
-
kW-mo/yr
-
TOTAL RECOMMENDED $44,281 $128,570 $33,050
754,687
kWh
$8,498
-
kW-mo/yr
$2,733
TOTAL IMPLEMENTED $5,733 $2,520 $3,000
68,580
kWh
- $2,733
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs