ITAC Assessment: CO0727
ITAC logo
ITAC Assessment: CO0727
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Injection Molded Livestock Tags
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 135
Plant Area 66,300
ft2
Annual Production 940,500
lb
Production Hrs. Annual 6,240
hrs
Location (State) Wyoming

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,144 1,727,080
kWh
Electricity Demand $74,560 4,073
kW-mo/yr
Electricity Fees $1,104 -
Natural Gas $14,523 2,160
MMBtu
TOTAL YEARLY COSTS $156,331
RECOMMENDED SAVINGS* $19,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,370 $150 $1,410
37,200
kWh
$960
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $970 $1,000 $(-5,940.0)
(-152,500)
kWh
$6,910
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $13,140 $26,760 $6,330
160,100
kWh
$8,210
-
kW-mo/yr
$70 $(-1,470.0)
04 2.7135: Install occupancy sensors $2,660 $2,570 $740
18,700
kWh
$1,870
-
kW-mo/yr
$10 $40
05 2.4322: Use or replace with energy efficient substitutes $550 $2,280 $280
7,200
kWh
$270
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $250 $280 $150
4,000
kWh
$100
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,940 $33,040 $2,970
74,700
kWh
$18,320
-
kW-mo/yr
$80 $(-1,430.0)
TOTAL IMPLEMENTED - - - - - -