Assessment Year | 2016 |
---|---|
Principal Product | Injection Molded Livestock Tags |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 135 |
Plant Area |
66,300
ft2
|
Annual Production | 940,500
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Wyoming |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,144 | 1,727,080 |
kWh
|
$0.038 |
Electricity Demand | $74,560 | 4,073 |
kW-mo/yr
|
$18.31 |
Electricity Fees | $1,104 | - |
|
- |
Natural Gas | $14,523 | 2,160 |
MMBtu
|
$6.72 |
TOTAL YEARLY COSTS | $156,331 | |||
RECOMMENDED SAVINGS* | $19,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,370 | $150 |
$1,410
37,200
kWh
|
$960
-
kW-mo/yr
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $970 | $1,000 |
$(-5,940.0)
(-152,500)
kWh
|
$6,910
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,140 | $26,760 |
$6,330
160,100
kWh
|
$8,210
-
kW-mo/yr
|
$70 | $(-1,470.0) | |
04 | 2.7135: Install occupancy sensors | $2,660 | $2,570 |
$740
18,700
kWh
|
$1,870
-
kW-mo/yr
|
$10 | $40 | |
05 | 2.4322: Use or replace with energy efficient substitutes | $550 | $2,280 |
$280
7,200
kWh
|
$270
-
kW-mo/yr
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $250 | $280 |
$150
4,000
kWh
|
$100
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $19,940 | $33,040 |
$2,970
74,700
kWh
|
$18,320
-
kW-mo/yr
|
$80 | $(-1,430.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs