| Assessment Year | 2016 |
|---|---|
| Principal Product | Injection Molded Livestock Tags |
| NAICS | 326199: All Other Plastics Product Manufacturing |
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 135 |
| Plant Area |
66,300
ft2
|
| Annual Production | 940,500
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Wyoming |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $66,144 | 1,727,080 |
kWh
|
$0.038 |
| Electricity Demand | $74,560 | 4,073 |
kW-mo/yr
|
$18.31 |
| Electricity Fees | $1,104 | - |
|
- |
| Natural Gas | $14,523 | 2,160 |
MMBtu
|
$6.72 |
| TOTAL YEARLY COSTS | $156,331 | |||
| RECOMMENDED SAVINGS* | $19,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,370 | $150 |
$1,410
37,200
kWh
|
$960
-
kW-mo/yr
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $970 | $1,000 |
$(-5,940.0)
(-152,500)
kWh
|
$6,910
-
kW-mo/yr
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,140 | $26,760 |
$6,330
160,100
kWh
|
$8,210
-
kW-mo/yr
|
$70 | $(-1,470.0) | |
| 04 | 2.7135: Install occupancy sensors | $2,660 | $2,570 |
$740
18,700
kWh
|
$1,870
-
kW-mo/yr
|
$10 | $40 | |
| 05 | 2.4322: Use or replace with energy efficient substitutes | $550 | $2,280 |
$280
7,200
kWh
|
$270
-
kW-mo/yr
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $250 | $280 |
$150
4,000
kWh
|
$100
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $19,940 | $33,040 |
$2,970
74,700
kWh
|
$18,320
-
kW-mo/yr
|
$80 | $(-1,430.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs