ITAC Assessment: CO0739
ITAC logo
ITAC Assessment: CO0739
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product environmental field sampling equipment, remediation equipment, and extrusion products (tubing)
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 230,000
ft2
Annual Production 1
units
Production Hrs. Annual 6,000
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,212 1,689,440
kWh
Electricity Demand $86,197 4,384
kW-mo/yr
Electricity Fees $454 -
Natural Gas $25,923 6,149
MMBtu
Waste Disposal Costs
Water Usage $6,347 1,527
Tgal
TOTAL YEARLY COSTS $180,133
RECOMMENDED SAVINGS* $26,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,448

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7135: Install occupancy sensors $5,400 $11,069 $2,588
66,000
kWh
$2,812
-
kW-mo/yr
02 2.2628: Utilize a less expensive cooling method $4,357 $12,500 $2,465
66,576
kWh
$1,892
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $291 $185 $291
7,862
kWh
-
04 2.4133: Use most efficient type of electric motors $4,067 - $1,235
32,045
kWh
$2,832
-
kW-mo/yr
05 2.2511: Insulate bare equipment $1,541 $3,605 $1,541
41,609
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,090 - - $11,090
-
kW-mo/yr
TOTAL RECOMMENDED $26,746 $27,359 $8,120
214,092
kWh
$18,626
-
kW-mo/yr
TOTAL IMPLEMENTED $15,448 $185 $1,526
39,907
kWh
$13,922
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs