ITAC Assessment: WV0192
ITAC logo
ITAC Assessment: WV0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product 55 gallon drums
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 52,000
ft2
Annual Production 575,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,841 1,355,217
kWh
Natural Gas $101,007 22,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,211 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $922 $40 $922
16,706
kWh
- - - - -
02 2.1133: Adjust burners for efficient operation $7,224 $1,645 - $7,224
-
MMBtu
- - - -
03 2.4157: Establish a predictive maintenance program $1,441 $800 $1,441
44,842
kWh
- - - - -
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $414 $65 - $414
-
MMBtu
- - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,440 $20 $1,440
26,084
kWh
- - - - -
06 2.8114: Change rate schedules or other changes in utility service $20,848 $200 - - - - - $20,848
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $631 $475 $631
11,430
kWh
- - - - -
08 3.5316: Contract a wood pallet recycling company $5,850 $65 - - - - $5,850
-
lb
-
09 3.4154: Eliminate leaks in water lines and valves $8,340 - - - $8,340
-
Tgal
- - -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $85,619 $56,000 - - - $85,619
-
gal
- -
11 2.8123: Pay utility bills on time $482 - - - - - - $482
TOTAL RECOMMENDED $133,211 $59,310 $4,434
99,062
kWh
$7,638
-
MMBtu
$8,340
-
Tgal
$85,619
-
gal
$5,850
-
lb
$21,330
TOTAL IMPLEMENTED $5,330 $1,400 $4,434
99,062
kWh
$414
-
MMBtu
- - - $482
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs