Assessment Year | 2000 |
---|---|
Principal Product | 55 gallon drums |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
52,000
ft2
|
Annual Production | 575,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,841 | 1,355,217 |
kWh
|
$0.055 |
Natural Gas | $101,007 | 22,910 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,211 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,330 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $922 | $40 |
$922
16,706
kWh
|
- | - | - | - | - | |
02 | 2.1133: Adjust burners for efficient operation | $7,224 | $1,645 | - |
$7,224
-
MMBtu
|
- | - | - | - | |
03 | 2.4157: Establish a predictive maintenance program | $1,441 | $800 |
$1,441
44,842
kWh
|
- | - | - | - | - | |
04 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $414 | $65 | - |
$414
-
MMBtu
|
- | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,440 | $20 |
$1,440
26,084
kWh
|
- | - | - | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $20,848 | $200 | - | - | - | - | - | $20,848 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $631 | $475 |
$631
11,430
kWh
|
- | - | - | - | - | |
08 | 3.5316: Contract a wood pallet recycling company | $5,850 | $65 | - | - | - | - |
$5,850
-
lb
|
- | |
09 | 3.4154: Eliminate leaks in water lines and valves | $8,340 | - | - | - |
$8,340
-
Tgal
|
- | - | - | |
10 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $85,619 | $56,000 | - | - | - |
$85,619
-
gal
|
- | - | |
11 | 2.8123: Pay utility bills on time | $482 | - | - | - | - | - | - | $482 | |
TOTAL RECOMMENDED | $133,211 | $59,310 |
$4,434
99,062
kWh
|
$7,638
-
MMBtu
|
$8,340
-
Tgal
|
$85,619
-
gal
|
$5,850
-
lb
|
$21,330 | ||
TOTAL IMPLEMENTED | $5,330 | $1,400 |
$4,434
99,062
kWh
|
$414
-
MMBtu
|
- | - | - | $482 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs