ITAC Assessment: WV0191
ITAC logo
ITAC Assessment: WV0191
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Cap & T-shirt printing and embroidery
NAICS
n/a
SIC 2395: Pleating, Decorative and Novelty Stitching, and Tucking for the Trade
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 90,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 7,176
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,097 862,544
kWh
Natural Gas $11,845 3,039
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,445 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $98,430

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $2,108 $233 $2,108
37,808
kWh
- - - -
02 2.6212: Turn off equipment during breaks, reduce operating time $1,405 - - $1,405
-
MMBtu
- - -
03 2.6212: Turn off equipment during breaks, reduce operating time $2,260 - - $2,260
-
MMBtu
- - -
04 2.7111: Reduce illumination to minimum necessary levels $3,907 $416 $3,907
70,047
kWh
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,275 $80 $1,275
22,860
kWh
- - - -
06 3.5217: Reuse / recycle/ sell paper products $120 $60 - - $120
-
lb
- -
07 3.5211: Reuse scrap glass as feed stock $82 - - - - $82
-
lb
-
08 4.431: Train operators for maximum operating efficiency $93,288 - - - - - $93,288
TOTAL RECOMMENDED $104,445 $789 $7,290
130,715
kWh
$3,665
-
MMBtu
$120
-
lb
$82
-
lb
$93,288
TOTAL IMPLEMENTED $98,430 $140 $1,275
22,860
kWh
$3,665
-
MMBtu
$120
-
lb
$82
-
lb
$93,288
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs