ITAC Assessment: GT0214
ITAC logo
ITAC Assessment: GT0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product EXTRUDED YARN
NAICS
n/a
SIC 2282: Yarn Texturizing, Throwing, Twisting, and Winding Mills
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 3,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,210 3,963,072
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,139

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2614: Use cooling tower or economizer to replace chiller cooling $5,957 $15,000 $5,957
163,540
kWh
02 2.2223: Enhance sensitivity of temperature control and cutoff $1,493 $2,000 $1,493
41,032
kWh
03 2.2443: Re-use or recycle hot or cold process exhaust air $7,406 $10,000 $7,406
203,400
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,664 $2,000 $1,664
45,721
kWh
05 2.4133: Use most efficient type of electric motors $619 $400 $619
16,999
kWh
TOTAL RECOMMENDED $17,139 $29,400 $17,139
470,692
kWh
TOTAL IMPLEMENTED $17,139 $29,400 $17,139
470,692
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs