ITAC Assessment: WV0184
ITAC logo
ITAC Assessment: WV0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Laminated Wood
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $100
M
to 500
M
# of Employees 320
Plant Area 360,000
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,808,501 46,726,847
kWh
Electricity Demand $693,115 97,762
kW-mo/yr
Electricity Fees $39,105 -
Natural Gas $313,911 91,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $349,857 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.2437: Recover waste heat from equipment $6,707 $280 - $6,707
-
MMBtu
- -
02 2.7314: Reduce ventilation air $694 $1,170 - $694
-
MMBtu
- -
03 2.2426: Use waste heat from flue gases to heat space conditioning air $33,886 $10,000 - $33,886
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $2,156 $220 $2,156
90,270
kWh
- - -
05 4.821: Pay bills on time to avoid late fees $40,958 $200 - $40,958
-
MMBtu
- -
06 3.5212: Regrind, reuse, or sell scrap plastic parts $4,706 $870 - - $4,706
-
lb
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,710 $11,000 - - $3,710
-
lb
-
08 4.445: Install equipment to move product $257,040 $105,000 - - - $257,040
TOTAL RECOMMENDED $349,857 $128,740 $2,156
90,270
kWh
$82,245
-
MMBtu
$8,416
-
lb
$257,040
TOTAL IMPLEMENTED $87,417 $21,700 $2,156
90,270
kWh
$81,551
-
MMBtu
$3,710
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs