ITAC Assessment: WV0177
ITAC logo
ITAC Assessment: WV0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Glass fabrication and tempering
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 48,000
ft2
Annual Production 4,800
ton
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,009 2,054,514
kWh
Natural Gas $2,208 260
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,608

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $302 $400 $302
6,741
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $121 $225 $121
2,638
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $270 $450 $270
5,862
kWh
- -
04 2.6218: Turn off equipment when not in use $697 - $697
15,240
kWh
- -
05 2.7144: Install spectral reflectors / delamp $3,419 $4,965 $3,419
74,736
kWh
- -
06 3.5248: Separate and recycle scrap metal to foundry or for sale $1,120 $300 - $1,120
-
lb
-
07 3.5217: Reuse / recycle/ sell paper products $1,300 $40 - $1,300
-
lb
-
08 3.5248: Separate and recycle scrap metal to foundry or for sale $1,500 $500 - $1,500
-
lb
-
09 4.513: Re-arrange equipment layout to reduce labor costs $6,500 - - - $6,500
TOTAL RECOMMENDED $15,229 $6,880 $4,809
105,217
kWh
$3,920
-
lb
$6,500
TOTAL IMPLEMENTED $13,608 $6,155 $4,688
102,579
kWh
$2,420
-
lb
$6,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs