ITAC Assessment: WV0175
ITAC logo
ITAC Assessment: WV0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rubber chemicals
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 1,829,520
ft2
Annual Production 73,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,194,450 35,592,615
kWh
Natural Gas $287,311 79,529
MMBtu
Coal $970,042 507,862
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $720,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $457,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Coal Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $177 $200 $177
5,275
kWh
- - - -
02 2.4221: Install compressor air intakes in coolest locations $332 $204 $332
9,965
kWh
- - - -
03 2.2113: Repair or replace steam traps $426,829 $88,360 - $426,829
-
MMBtu
- - -
04 2.3212: Optimize plant power factor $14,700 $14,700 $14,700
3,690,504
kWh
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $8,476 $884 - - - $8,476
-
lb
-
06 3.4154: Eliminate leaks in water lines and valves $7,884 - - - $7,884
-
Tgal
- -
07 4.431: Train operators for maximum operating efficiency $262,080 - - - - - $262,080
TOTAL RECOMMENDED $720,478 $104,348 $15,209
3,705,744
kWh
$426,829
-
MMBtu
$7,884
-
Tgal
$8,476
-
lb
$262,080
TOTAL IMPLEMENTED $457,889 $103,944 $14,700
3,690,504
kWh
$426,829
-
MMBtu
$7,884
-
Tgal
$8,476
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Coal Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs