| Assessment Year | 1999 |
|---|---|
| Principal Product | Rubber chemicals |
| NAICS |
n/a
|
| SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 250 |
| Plant Area |
1,829,520
ft2
|
| Annual Production | 73,000,000
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,194,450 | 35,592,615 |
kWh
|
$0.034 |
| Natural Gas | $287,311 | 79,529 |
MMBtu
|
$3.61 |
| Coal | $970,042 | 507,862 |
MMBtu
|
$1.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $720,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $457,889 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Coal Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $177 | $200 |
$177
5,275
kWh
|
- | - | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $332 | $204 |
$332
9,965
kWh
|
- | - | - | - | |
| 03 | 2.2113: Repair or replace steam traps | $426,829 | $88,360 | - |
$426,829
-
MMBtu
|
- | - | - | |
| 04 | 2.3212: Optimize plant power factor | $14,700 | $14,700 |
$14,700
3,690,504
kWh
|
- | - | - | - | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,476 | $884 | - | - | - |
$8,476
-
lb
|
- | |
| 06 | 3.4154: Eliminate leaks in water lines and valves | $7,884 | - | - | - |
$7,884
-
Tgal
|
- | - | |
| 07 | 4.431: Train operators for maximum operating efficiency | $262,080 | - | - | - | - | - | $262,080 | |
| TOTAL RECOMMENDED | $720,478 | $104,348 |
$15,209
3,705,744
kWh
|
$426,829
-
MMBtu
|
$7,884
-
Tgal
|
$8,476
-
lb
|
$262,080 | ||
| TOTAL IMPLEMENTED | $457,889 | $103,944 |
$14,700
3,690,504
kWh
|
$426,829
-
MMBtu
|
$7,884
-
Tgal
|
$8,476
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Coal Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs