Assessment Year | 1999 |
---|---|
Principal Product | Repair and overhaul of Gas Turbine Engines |
NAICS |
n/a
|
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | $100 M to 500M |
# of Employees | 450 |
Plant Area |
50,000
ft2
|
Annual Production | 816
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $245,622 | 9,004,689 |
kWh
|
$0.027 |
Electricity Demand | $144,035 | 16,734 |
kW-mo/yr
|
$8.61 |
Electricity Fees | $16,582 | - |
|
- |
Natural Gas | $107,659 | 25,861 |
MMBtu
|
$4.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $607,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $464,022 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,330 | $112 |
$1,330
45,721
kWh
|
- | - | - | - | - | - | |
02 | 2.7122: Disconnect ballasts | $946 | $80 |
$946
10,844
kWh
|
- | - | - | - | - | - | |
03 | 2.3212: Optimize plant power factor | $1,515 | $4,140 | - | $1,515 | - | - | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $648 |
$379
1,172
kWh
|
- | - | - | - | - | - | |
05 | 2.7144: Install spectral reflectors / delamp | $33,645 | $34,820 |
$33,645
1,155,920
kWh
|
- | - | - | - | - | - | |
06 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $6,850 | - |
$6,850
235,346
kWh
|
- | - | - | - | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $17,068 | - | - | - |
$17,068
-
MMBtu
|
- | - | - | - | |
08 | 3.5217: Reuse / recycle/ sell paper products | $3,183 | $576 | - | - | - | - |
$3,183
-
lb
|
- | - | |
09 | 3.5316: Contract a wood pallet recycling company | $1,080 | $55 | - | - | - | - |
$1,080
-
lb
|
- | - | |
10 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $458,008 | $16,192 | - | - | - |
$458,008
-
gal
|
- | - | - | |
11 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $426 | - | - | - | - | - | - |
$426
-
lb
|
- | |
12 | 4.652: Replace existing equipment with more suitable substitutes | $83,200 | $1,673 | - | - | - | - | - | - | $83,200 | |
TOTAL RECOMMENDED | $607,630 | $58,296 |
$43,150
1,449,003
kWh
|
$1,515 |
$17,068
-
MMBtu
|
$458,008
-
gal
|
$4,263
-
lb
|
$426
-
lb
|
$83,200 | ||
TOTAL IMPLEMENTED | $464,022 | $17,551 |
$1,325
12,016
kWh
|
- | - |
$458,008
-
gal
|
$4,263
-
lb
|
$426
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs