ITAC Assessment: WV0173
ITAC logo
ITAC Assessment: WV0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Repair and overhaul of Gas Turbine Engines
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $100
M
to 500
M
# of Employees 450
Plant Area 50,000
ft2
Annual Production 816
pieces
Production Hrs. Annual 8,736
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,622 9,004,689
kWh
Electricity Demand $144,035 16,734
kW-mo/yr
Electricity Fees $16,582 -
Natural Gas $107,659 25,861
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $607,630 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $464,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings
01 2.4221: Install compressor air intakes in coolest locations $1,330 $112 $1,330
45,721
kWh
- - - - - -
02 2.7122: Disconnect ballasts $946 $80 $946
10,844
kWh
- - - - - -
03 2.3212: Optimize plant power factor $1,515 $4,140 - $1,515 - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $648 $379
1,172
kWh
- - - - - -
05 2.7144: Install spectral reflectors / delamp $33,645 $34,820 $33,645
1,155,920
kWh
- - - - - -
06 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $6,850 - $6,850
235,346
kWh
- - - - - -
07 2.8114: Change rate schedules or other changes in utility service $17,068 - - - $17,068
-
MMBtu
- - - -
08 3.5217: Reuse / recycle/ sell paper products $3,183 $576 - - - - $3,183
-
lb
- -
09 3.5316: Contract a wood pallet recycling company $1,080 $55 - - - - $1,080
-
lb
- -
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $458,008 $16,192 - - - $458,008
-
gal
- - -
11 3.5212: Regrind, reuse, or sell scrap plastic parts $426 - - - - - - $426
-
lb
-
12 4.652: Replace existing equipment with more suitable substitutes $83,200 $1,673 - - - - - - $83,200
TOTAL RECOMMENDED $607,630 $58,296 $43,150
1,449,003
kWh
$1,515 $17,068
-
MMBtu
$458,008
-
gal
$4,263
-
lb
$426
-
lb
$83,200
TOTAL IMPLEMENTED $464,022 $17,551 $1,325
12,016
kWh
- - $458,008
-
gal
$4,263
-
lb
$426
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs