Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bent and flat fabricated glass
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 110,000
ft2
Annual Production 2,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,475 3,679,660
kWh
Electricity Demand $140,295 14,901
kW-mo/yr
Electricity Fees $(-7,140.0) -
Natural Gas $115,191 22,872
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,451

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $3,196 $12,350 - - $3,196 - - - -
02 2.2442: Preheat combustion air with waste heat $6,652 $4,300 - - - $6,652
-
MMBtu
- - -
03 2.7241: Install outside air damper / economizer on hvac unit $600 $1,290 - - - $600
-
MMBtu
- - -
04 2.2511: Insulate bare equipment $24,192 $5,439 - - - $24,192
-
MMBtu
- - -
05 2.7122: Disconnect ballasts $203 $80 $203
4,982
kWh
- - - - - -
06 2.6218: Turn off equipment when not in use $36 - $36
879
kWh
- - - - - -
07 2.4221: Install compressor air intakes in coolest locations $730 $198 $730
17,878
kWh
- - - - - -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $54,120 - - $54,120
-
kW-mo/yr
- - - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $168 $25 $168
4,103
kWh
- - - - - -
10 3.5212: Regrind, reuse, or sell scrap plastic parts $7,120 $1,260 - - - - - $7,120
-
lb
-
11 3.4111: Use closed cycle process to minimize waste water production $40,226 $12,000 - - - - $40,226
-
gal
- -
12 3.5315: Lease / purchase baler; sell cardboard to recycler $3,840 $1,260 - - - - - $3,840
-
lb
-
13 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,999 $11,000 - - - - - $7,999
-
lb
-
14 3.5311: Recover and reuse waste material $6,940 $1,800 - - - - - $6,940
-
lb
-
15 4.511: Expand operations into unused space $6,000 $1,050 - - - - - - $6,000
TOTAL RECOMMENDED $162,022 $52,052 $1,137
27,842
kWh
$54,120
-
kW-mo/yr
$3,196 $31,444
-
MMBtu
$40,226
-
gal
$25,899
-
lb
$6,000
TOTAL IMPLEMENTED $102,451 $10,889 $239
5,861
kWh
$54,120
-
kW-mo/yr
- $24,192
-
MMBtu
- $17,900
-
lb
$6,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings