| Assessment Year | 1999 |
|---|---|
| Principal Product | PVC and Polythene pipes |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 94 |
| Plant Area |
55,000
ft2
|
| Annual Production | 265,000,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $700,307 | 17,256,155 |
kWh
|
$0.041 |
| Electricity Demand | $229,821 | 27,751 |
kW-mo/yr
|
$8.28 |
| Natural Gas | $84,123 | 32,494 |
MMBtu
|
$2.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $74,923 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $30,419 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,350 | $100 |
$3,350
122,802
kWh
|
- | - | - | - | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,484 | $45 |
$7,484
274,326
kWh
|
- | - | - | - | - | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $9,469 | $4,300 | - | - | - |
$9,469
-
MMBtu
|
- | - | - | |
| 04 | 2.8123: Pay utility bills on time | $1,874 | - | - | - | $1,874 | - | - | - | - | |
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $923 | $1,250 |
$923
33,705
kWh
|
- | - | - | - | - | - | |
| 06 | 2.3212: Optimize plant power factor | $2,680 | $6,918 | - | - | $2,680 | - | - | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $2,220 | $360 |
$2,220
81,477
kWh
|
- | - | - | - | - | - | |
| 08 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $12,420 | - | - |
$12,420
-
kW-mo/yr
|
- | - | - | - | - | |
| 09 | 3.5316: Contract a wood pallet recycling company | $7,875 | $65 | - | - | - | - | - |
$7,875
-
lb
|
- | |
| 10 | 3.3131: Use evaporation to concentrate material | $11,628 | $12,888 | - | - | - | - |
$11,628
-
Tgal
|
- | - | |
| 11 | 4.445: Install equipment to move product | $15,000 | $3,000 | - | - | - | - | - | - | $15,000 | |
| TOTAL RECOMMENDED | $74,923 | $28,926 |
$13,977
512,310
kWh
|
$12,420
-
kW-mo/yr
|
$4,554 |
$9,469
-
MMBtu
|
$11,628
-
Tgal
|
$7,875
-
lb
|
$15,000 | ||
| TOTAL IMPLEMENTED | $30,419 | $7,443 |
$5,570
204,279
kWh
|
$12,420
-
kW-mo/yr
|
$4,554 | - | - |
$7,875
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs