Assessment Year | 2019 |
---|---|
Principal Product | Roofing Insulation and Composite Materials |
NAICS | 324122: Asphalt Shingle and Coating Materials Manufacturing |
SIC | 2952: Asphalt Felts and Coatings |
Sales Range | $50 M to 100M |
# of Employees | 132 |
Plant Area |
400,000
ft2
|
Annual Production | 8,300,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $529,340 | 9,298,571 |
kWh
|
$0.057 | |
Electricity Demand | $112,366 | 16,722 |
kW-mo/yr
|
$6.72 | |
Electricity Fees | $78,520 | - |
|
- | |
Natural Gas | $817,470 | 373,302 |
MMBtu
|
$2.19 | |
Waste Disposal Costs | |||||
Water Usage | $26,036 | 10,474 |
Tgal
|
$2.49 | |
Water Disposal | $27,786 | 3,711 |
Tgal
|
$7.49 | |
TOTAL YEARLY COSTS | $1,591,518 | ||||
RECOMMENDED SAVINGS* | $108,567 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $25,449 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8212: Reduce delivery schedules | $43,506 | - | - | - | - | $40,000 | $3,506 | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,621 | $2,800 | - | - |
$19,621
-
MMBtu
|
- | - | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $14,666 | $30,000 | - | - |
$14,666
-
MMBtu
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $14,533 | $1,600 | - | - |
$14,533
-
MMBtu
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,991 | $4,959 |
$6,879
120,888
kWh
|
$1,112
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $2,925 | $1,308 | - | - |
$2,925
-
MMBtu
|
- | - | - | |
07 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $2,600 | $9,464 |
$2,600
45,693
kWh
|
- | - | - | - | - | |
08 | 2.6218: Turn off equipment when not in use | $1,990 | - |
$1,990
34,969
kWh
|
- | - | - | - | - | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $735 | - |
$537
9,442
kWh
|
- | - | $90 | - | $108 | |
TOTAL RECOMMENDED | $108,567 | $50,131 |
$12,006
210,992
kWh
|
$1,112
-
kW-mo/yr
|
$51,745
-
MMBtu
|
$40,090 | $3,506 | $108 | ||
TOTAL IMPLEMENTED | $25,449 | $7,867 |
$6,879
120,888
kWh
|
$1,112
-
kW-mo/yr
|
$17,458
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs