| Assessment Year | 1993 |
|---|---|
| Principal Product | POLYYURETHANE FOAM |
| NAICS |
n/a
|
| SIC | 3086: Plastics Foam Products |
| Sales Range | $500 k to 1M |
| # of Employees | 120 |
| Plant Area |
175,000
ft2
|
| Annual Production | 124,000
thousand feet
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $202,701 | 3,305,393 |
kWh
|
$0.061 |
| Natural Gas | $42,562 | 7,197 |
MMBtu
|
$5.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $62,993 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,285 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,736 | $17,345 |
$5,736
94,080
kWh
|
- | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $21,182 | $1,060 |
$21,182
347,304
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,545 | $5,513 |
$18,545
303,927
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $431 | $391 |
$431
7,034
kWh
|
- | |
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,347 | $1,000 | - |
$1,347
-
MMBtu
|
|
| 06 | 2.4133: Use most efficient type of electric motors | $10,938 | $20,958 |
$10,938
179,367
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,816 | $1,000 |
$2,816
46,307
kWh
|
- | |
| 08 | 2.4221: Install compressor air intakes in coolest locations | $236 | $500 |
$236
3,810
kWh
|
- | |
| 09 | 2.7232: Replace existing hvac unit with high efficiency model | $488 | $2,000 |
$488
7,913
kWh
|
- | |
| 10 | 2.7492: Use proper thickness of insulation on building envelope | $814 | $1,392 |
$814
13,482
kWh
|
- | |
| 11 | 2.2136: Install / repair insulation on steam lines | $460 | $407 | - |
$460
-
MMBtu
|
|
| TOTAL RECOMMENDED | $62,993 | $51,566 |
$61,186
1,003,224
kWh
|
$1,807
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $16,285 | $25,865 |
$14,478
237,397
kWh
|
$1,807
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs