| Assessment Year | 1999 |
|---|---|
| Principal Product | Brass Forgings |
| NAICS |
n/a
|
| SIC | 3491: Industrial Valves |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
65,000
ft2
|
| Annual Production | 14,000,000
ton
|
| Production Hrs. Annual | 7,488
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $183,848 | 4,821,219 |
kWh
|
$0.038 |
| Electricity Demand | $63,242 | 13,770 |
kW-mo/yr
|
$4.59 |
| Electricity Fees | $8,531 | - |
|
- |
| Natural Gas | $22,524 | 8,900 |
MMBtu
|
$2.53 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,192 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,398 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,403 | $675 |
$1,403
35,170
kWh
|
- | - | - | - | |
| 02 | 2.7122: Disconnect ballasts | $3,291 | $320 |
$3,291
964,537
kWh
|
- | - | - | - | |
| 03 | 2.7241: Install outside air damper / economizer on hvac unit | $3,518 | $1,128 |
$3,518
88,218
kWh
|
- | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,863 | $228 |
$1,863
46,600
kWh
|
- | - | - | - | |
| 05 | 2.2511: Insulate bare equipment | $486 | $160 | - | - |
$486
-
MMBtu
|
- | - | |
| 06 | 2.3212: Optimize plant power factor | $2,790 | $8,810 | - | $2,790 | - | - | - | |
| 07 | 2.2437: Recover waste heat from equipment | $918 | $428 | - | - |
$918
-
MMBtu
|
- | - | |
| 08 | 3.5217: Reuse / recycle/ sell paper products | $523 | $192 | - | - | - |
$523
-
lb
|
- | |
| 09 | 4.515: Install shelves / racks to utilize unused space | $1,200 | $1,584 | - | - | - | - | $1,200 | |
| 10 | 4.521: Clear and rent existing space | $7,200 | $1,920 | - | - | - | - | $7,200 | |
| TOTAL RECOMMENDED | $23,192 | $15,445 |
$10,075
1,134,525
kWh
|
$2,790 |
$1,404
-
MMBtu
|
$523
-
lb
|
$8,400 | ||
| TOTAL IMPLEMENTED | $16,398 | $5,347 |
$6,557
1,046,307
kWh
|
- |
$918
-
MMBtu
|
$523
-
lb
|
$8,400 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs