ITAC Assessment: WV0164
ITAC logo
ITAC Assessment: WV0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Brass Forgings
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 65,000
ft2
Annual Production 14,000,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,848 4,821,219
kWh
Electricity Demand $63,242 13,770
kW-mo/yr
Electricity Fees $8,531 -
Natural Gas $22,524 8,900
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,192 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,398

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,403 $675 $1,403
35,170
kWh
- - - -
02 2.7122: Disconnect ballasts $3,291 $320 $3,291
964,537
kWh
- - - -
03 2.7241: Install outside air damper / economizer on hvac unit $3,518 $1,128 $3,518
88,218
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,863 $228 $1,863
46,600
kWh
- - - -
05 2.2511: Insulate bare equipment $486 $160 - - $486
-
MMBtu
- -
06 2.3212: Optimize plant power factor $2,790 $8,810 - $2,790 - - -
07 2.2437: Recover waste heat from equipment $918 $428 - - $918
-
MMBtu
- -
08 3.5217: Reuse / recycle/ sell paper products $523 $192 - - - $523
-
lb
-
09 4.515: Install shelves / racks to utilize unused space $1,200 $1,584 - - - - $1,200
10 4.521: Clear and rent existing space $7,200 $1,920 - - - - $7,200
TOTAL RECOMMENDED $23,192 $15,445 $10,075
1,134,525
kWh
$2,790 $1,404
-
MMBtu
$523
-
lb
$8,400
TOTAL IMPLEMENTED $16,398 $5,347 $6,557
1,046,307
kWh
- $918
-
MMBtu
$523
-
lb
$8,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs