ITAC Assessment: WV0162
ITAC logo
ITAC Assessment: WV0162
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Complex Grey/Ductile Iron Castings
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 25,800
ft2
Annual Production 5,200
lb
Production Hrs. Annual 4,160
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,558 2,898,007
kWh
Electricity Fees $378 -
Natural Gas $17,581 3,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,386

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $107,972 $39,000 - $107,972 - - -
02 2.1331: Burn a less expensive grade of fuel $6,113 $4,000 - - - - $6,113
03 2.4221: Install compressor air intakes in coolest locations $317 $20 $317
5,275
kWh
- - - -
04 2.8123: Pay utility bills on time $2,895 - - $2,895 - - -
05 2.2442: Preheat combustion air with waste heat $1,295 $1,350 - - $1,295
-
MMBtu
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,920 $109 $3,920
65,064
kWh
- - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,780 $36 $1,780
29,308
kWh
- - - -
08 2.4314: Use synthetic lubricant $988 $636 $988
16,413
kWh
- - - -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $381 $150 $381
6,448
kWh
- - - -
10 2.2437: Recover waste heat from equipment $691 $180 $691
41,618
kWh
- - - -
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $560 $2,000 - - - $560
-
lb
-
12 3.5316: Contract a wood pallet recycling company $1,170 $50 - - - $1,170
-
lb
-
13 4.522: Modify storage space to avoid rental of a warehouse $20,000 $432 - - - - $20,000
TOTAL RECOMMENDED $148,082 $47,963 $8,077
164,126
kWh
$110,867 $1,295
-
MMBtu
$1,730
-
lb
$26,113
TOTAL IMPLEMENTED $27,386 $1,383 $7,386
122,508
kWh
- - - $20,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs