Assessment Year | 1999 |
---|---|
Principal Product | Party Decorations |
NAICS |
n/a
|
SIC | 2621: Paper Mills |
Sales Range | $10 M to 50M |
# of Employees | 450 |
Plant Area |
885,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $457,814 | 4,664,127 |
kWh
|
$0.098 |
Electricity Demand | $228,711 | 18,850 |
kW-mo/yr
|
$12.13 |
Electricity Fees | $4,459 | - |
|
- |
Natural Gas | $62,408 | 14,329 |
MMBtu
|
$4.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $242,843 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $18,842 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1113: Reduce combustion air flow to optimum | $5,912 | $1,000 | - | - |
$5,912
-
MMBtu
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $2,677 | $3,450 | - | - |
$2,677
-
MMBtu
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $467 | $1,000 | - | - |
$467
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $802 | $360 |
$802
16,413
kWh
|
- | - | - | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $148 | $126 |
$148
9,965
kWh
|
- | - | - | - | |
06 | 2.8113: Purchase gas directly from a contract gas supplier | $12,323 | - | - | - | - | - | $12,323 | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $140 | - | - | - | - |
$140
-
lb
|
- | |
08 | 4.521: Clear and rent existing space | $56,250 | $1,440 | - | - | - | - | $56,250 | |
09 | 4.632: Change operating conditions | $164,124 | - | - |
$164,124
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $242,843 | $7,376 |
$950
26,378
kWh
|
$164,124
-
kW-mo/yr
|
$9,056
-
MMBtu
|
$140
-
lb
|
$68,573 | ||
TOTAL IMPLEMENTED | $18,842 | $2,000 | - | - |
$6,379
-
MMBtu
|
$140
-
lb
|
$12,323 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs