ITAC Assessment: WV0158
ITAC logo
ITAC Assessment: WV0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Party Decorations
NAICS
n/a
SIC 2621: Paper Mills
Sales Range $10
M
to 50
M
# of Employees 450
Plant Area 885,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,184
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $457,814 4,664,127
kWh
Electricity Demand $228,711 18,850
kW-mo/yr
Electricity Fees $4,459 -
Natural Gas $62,408 14,329
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $242,843 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,842

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.1113: Reduce combustion air flow to optimum $5,912 $1,000 - - $5,912
-
MMBtu
- -
02 2.2414: Use waste heat from hot flue gases to preheat $2,677 $3,450 - - $2,677
-
MMBtu
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $467 $1,000 - - $467
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $802 $360 $802
16,413
kWh
- - - -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $148 $126 $148
9,965
kWh
- - - -
06 2.8113: Purchase gas directly from a contract gas supplier $12,323 - - - - - $12,323
07 3.5212: Regrind, reuse, or sell scrap plastic parts $140 - - - - $140
-
lb
-
08 4.521: Clear and rent existing space $56,250 $1,440 - - - - $56,250
09 4.632: Change operating conditions $164,124 - - $164,124
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $242,843 $7,376 $950
26,378
kWh
$164,124
-
kW-mo/yr
$9,056
-
MMBtu
$140
-
lb
$68,573
TOTAL IMPLEMENTED $18,842 $2,000 - - $6,379
-
MMBtu
$140
-
lb
$12,323
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs