ITAC Assessment: WV0144
ITAC logo
ITAC Assessment: WV0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Machine made crystal
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 282
Plant Area 140,000
ft2
Annual Production 9,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,841 8,980,950
kWh
Electricity Demand $196,514 22,000
kW-mo/yr
Electricity Fees $(-15,763.0) -
Natural Gas $407,695 106,340
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $588 - $588
23,740
kWh
- - - - - -
02 2.2511: Insulate bare equipment $8,584 $1,007 - - $8,584
-
MMBtu
- - - -
03 2.4221: Install compressor air intakes in coolest locations $2,478 $140 $2,478
100,528
kWh
- - - - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,816 $560 $1,816
73,564
kWh
- - - - - -
05 2.2511: Insulate bare equipment $5,809 $263 - - $5,809
-
MMBtu
- - - -
06 2.7243: Improve air circulation with destratification fans / other methods $3,804 $2,000 - - $3,804
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $7,565 $3,310 $3,085
125,147
kWh
$4,480
-
kW-mo/yr
- - - - -
08 2.4314: Use synthetic lubricant $2,801 $390 $2,801
113,716
kWh
- - - - - -
09 2.8113: Purchase gas directly from a contract gas supplier $35,092 - - - - - - - $35,092
10 3.5212: Regrind, reuse, or sell scrap plastic parts $122 - - - - - - $122
-
lb
-
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,403 $11,000 - - - - $3,403
-
lb
- -
12 3.4111: Use closed cycle process to minimize waste water production $23,400 $8,050 - - - $23,400
-
gal
- - -
13 3.5315: Lease / purchase baler; sell cardboard to recycler $6,700 $60 - - - - $6,700
-
lb
- -
14 3.5316: Contract a wood pallet recycling company $300 $60 - - - - $300
-
lb
- -
15 4.432: Cross-train personnel to avoid lost time $83,200 $1,673 - - - - - - $83,200
TOTAL RECOMMENDED $185,662 $28,513 $10,768
436,695
kWh
$4,480
-
kW-mo/yr
$18,197
-
MMBtu
$23,400
-
gal
$10,403
-
lb
$122
-
lb
$118,292
TOTAL IMPLEMENTED $111,554 $7,060 $8,290
336,167
kWh
$4,480
-
kW-mo/yr
$8,584
-
MMBtu
- $7,000
-
lb
- $83,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs