Assessment Year | 1998 |
---|---|
Principal Product | Machine made crystal |
NAICS |
n/a
|
SIC | 3231: Glass Products, Made of Purchased Glass |
Sales Range | $10 M to 50M |
# of Employees | 282 |
Plant Area |
140,000
ft2
|
Annual Production | 9,000
ton
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $417,841 | 8,980,950 |
kWh
|
$0.047 |
Electricity Demand | $196,514 | 22,000 |
kW-mo/yr
|
$8.93 |
Electricity Fees | $(-15,763.0) | - |
|
- |
Natural Gas | $407,695 | 106,340 |
MMBtu
|
$3.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,662 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $111,554 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $588 | - |
$588
23,740
kWh
|
- | - | - | - | - | - | |
02 | 2.2511: Insulate bare equipment | $8,584 | $1,007 | - | - |
$8,584
-
MMBtu
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,478 | $140 |
$2,478
100,528
kWh
|
- | - | - | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,816 | $560 |
$1,816
73,564
kWh
|
- | - | - | - | - | - | |
05 | 2.2511: Insulate bare equipment | $5,809 | $263 | - | - |
$5,809
-
MMBtu
|
- | - | - | - | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $3,804 | $2,000 | - | - |
$3,804
-
MMBtu
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,565 | $3,310 |
$3,085
125,147
kWh
|
$4,480
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.4314: Use synthetic lubricant | $2,801 | $390 |
$2,801
113,716
kWh
|
- | - | - | - | - | - | |
09 | 2.8113: Purchase gas directly from a contract gas supplier | $35,092 | - | - | - | - | - | - | - | $35,092 | |
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $122 | - | - | - | - | - | - |
$122
-
lb
|
- | |
11 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,403 | $11,000 | - | - | - | - |
$3,403
-
lb
|
- | - | |
12 | 3.4111: Use closed cycle process to minimize waste water production | $23,400 | $8,050 | - | - | - |
$23,400
-
gal
|
- | - | - | |
13 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $6,700 | $60 | - | - | - | - |
$6,700
-
lb
|
- | - | |
14 | 3.5316: Contract a wood pallet recycling company | $300 | $60 | - | - | - | - |
$300
-
lb
|
- | - | |
15 | 4.432: Cross-train personnel to avoid lost time | $83,200 | $1,673 | - | - | - | - | - | - | $83,200 | |
TOTAL RECOMMENDED | $185,662 | $28,513 |
$10,768
436,695
kWh
|
$4,480
-
kW-mo/yr
|
$18,197
-
MMBtu
|
$23,400
-
gal
|
$10,403
-
lb
|
$122
-
lb
|
$118,292 | ||
TOTAL IMPLEMENTED | $111,554 | $7,060 |
$8,290
336,167
kWh
|
$4,480
-
kW-mo/yr
|
$8,584
-
MMBtu
|
- |
$7,000
-
lb
|
- | $83,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs