ITAC Assessment: WV0139
ITAC logo
ITAC Assessment: WV0139
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Beverage Bottles
NAICS
n/a
SIC 3085: Plastics Bottles
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 700,000
ft2
Annual Production 1,080,000,000
pieces
Production Hrs. Annual 8,664
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,742,445 72,071,220
kWh
Natural Gas $217,889 33,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,467

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,443 $9,661 $4,443
175,850
kWh
- - -
02 2.2511: Insulate bare equipment $804 $576 - $804
-
MMBtu
- -
03 2.2511: Insulate bare equipment $8,320 $1,032 $8,320
329,719
kWh
- - -
04 2.6218: Turn off equipment when not in use $2,429 - $2,429
96,131
kWh
- - -
05 2.6218: Turn off equipment when not in use $364 - $364
14,361
kWh
- - -
06 2.8113: Purchase gas directly from a contract gas supplier $66,775 - - $66,775
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $398 $448 $398
15,826
kWh
- - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $5,400 $100 - - $5,400
-
lb
-
09 3.5212: Regrind, reuse, or sell scrap plastic parts $102 - - - - $102
-
lb
10 4.211: Consider use / purchase of bulk materials where possible $37,500 $50,000 - - $37,500
-
lb
-
TOTAL RECOMMENDED $126,535 $61,817 $15,954
631,887
kWh
$67,579
-
MMBtu
$42,900
-
lb
$102
-
lb
TOTAL IMPLEMENTED $56,467 $61,369 $12,763
505,569
kWh
$804
-
MMBtu
$42,900
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs