ITAC Assessment: WV0138
ITAC logo
ITAC Assessment: WV0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wood Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area 185,000
ft2
Annual Production 600
thousand feet
Production Hrs. Annual 2,168
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,459 1,690,797
kWh
Natural Gas $35,832 5,182
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,475

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $564 $2,195 $564
9,965
kWh
- - -
02 2.4314: Use synthetic lubricant $343 $254 $343
5,862
kWh
- - -
03 2.2437: Recover waste heat from equipment $865 $324 - $865
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $186 $112 $186
3,224
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $515 $240 $515
8,792
kWh
- - -
06 2.4133: Use most efficient type of electric motors $900 $3,830 $900
14,947
kWh
- - -
07 2.2511: Insulate bare equipment $4,520 $380 - $4,520
-
MMBtu
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,724 - - - - $2,724
09 3.5315: Lease / purchase baler; sell cardboard to recycler $3,429 - - - $3,429
-
lb
-
10 4.431: Train operators for maximum operating efficiency $57,600 $272 - - $57,600
-
lb
-
TOTAL RECOMMENDED $71,646 $7,607 $2,508
42,790
kWh
$5,385
-
MMBtu
$61,029
-
lb
$2,724
TOTAL IMPLEMENTED $8,475 $6,519 $2,322
39,566
kWh
- $3,429
-
lb
$2,724
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs