Assessment Year | 1998 |
---|---|
Principal Product | Ceramic glazed wall tile |
NAICS |
n/a
|
SIC | 3253: Ceramic Wall and Floor Tile |
Sales Range | $10 M to 50M |
# of Employees | 470 |
Plant Area |
305,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $740,460 | 19,557,152 |
kWh
|
$0.038 |
Natural Gas | $1,273,603 | 350,537 |
MMBtu
|
$3.63 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,202 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,981 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,626 | $10,375 |
$12,626
333,529
kWh
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $4,603 | $720 |
$4,603
121,630
kWh
|
- | - | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $777 | $3,870 |
$777
20,516
kWh
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $5,705 | $1,225 | - |
$5,705
-
MMBtu
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $17,164 | $2,265 | - |
$17,164
-
MMBtu
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $9,240 | $2,000 |
$9,240
243,845
kWh
|
- | - | - | |
07 | 2.4314: Use synthetic lubricant | $2,115 | $2,070 |
$2,115
49,824
kWh
|
- | - | - | |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $13,347 | $11,000 | - | - | - | $13,347 | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $1,625 | $1,480 | - | - |
$1,625
-
Tgal
|
- | |
10 | 4.112: Replace old machine with new automatic multi-station tool | $9,000 | $2,500 | - | - | - | $9,000 | |
TOTAL RECOMMENDED | $76,202 | $37,505 |
$29,361
769,344
kWh
|
$22,869
-
MMBtu
|
$1,625
-
Tgal
|
$22,347 | ||
TOTAL IMPLEMENTED | $32,981 | $16,945 |
$23,981
627,198
kWh
|
- | - | $9,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs