ITAC Assessment: WV0133
ITAC logo
ITAC Assessment: WV0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product cold rolled stripped carbon
NAICS
n/a
SIC 3316: Cold-Rolled Steel Sheet, Strip, and Bars
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 1,089,000
ft2
Annual Production 0
ton
Production Hrs. Annual 8,568
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,267,699 16,316,530
kWh
Fuel Oil #1 $864,235 198,728
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,820

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,705 $2,273 $3,705
47,773
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,917 $248 $1,917
24,619
kWh
- - -
03 2.4314: Use synthetic lubricant $3,504 $405 $3,504
45,135
kWh
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,802 $1,000 - $5,802
-
MMBtu
- -
05 2.2414: Use waste heat from hot flue gases to preheat $5,194 $2,900 - $5,194
-
MMBtu
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,834 $6,000 $6,834
87,925
kWh
- - -
07 2.7241: Install outside air damper / economizer on hvac unit $6,854 $1,210 $6,854
88,218
kWh
- - -
08 2.4133: Use most efficient type of electric motors $72,430 $100,440 $72,430
931,125
kWh
- - -
09 2.7231: Use radiant heater for spot heating $18,727 $350 - - - $18,727
10 3.4111: Use closed cycle process to minimize waste water production $1,372 $7,000 - - $1,372
-
Tgal
-
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,796 $11,000 - - - $6,796
12 3.5315: Lease / purchase baler; sell cardboard to recycler $3,600 - - - - $3,600
13 4.511: Expand operations into unused space $11,375 $2,520 - - - $11,375
TOTAL RECOMMENDED $148,110 $135,346 $95,244
1,224,795
kWh
$10,996
-
MMBtu
$1,372
-
Tgal
$40,498
TOTAL IMPLEMENTED $102,820 $118,638 $86,473
1,111,958
kWh
- $1,372
-
Tgal
$14,975
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs