ITAC Assessment: KU0261
ITAC logo
ITAC Assessment: KU0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product CUSTOM INJECT MOLDED PTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $417,418 7,077,081
kWh
Natural Gas $7,102 1,718
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $68,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.8121: Apply for tax-free status for energy purchases $43,671 - $43,671
-
kWh
02 2.2621: Modify refrigeration system to operate at a lower pressure $7,119 $14,000 $7,119
120,750
kWh
03 2.2621: Modify refrigeration system to operate at a lower pressure $3,957 $2,400 $3,957
67,116
kWh
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $4,268 $2,000 $4,268
72,392
kWh
05 2.4221: Install compressor air intakes in coolest locations $743 $400 $743
12,603
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,683 $7,109 $4,683
79,426
kWh
07 2.2511: Insulate bare equipment $2,592 $3,600 $2,592
43,962
kWh
08 2.4312: Improve lubrication practices $1,192 - $1,192
20,223
kWh
TOTAL RECOMMENDED $68,225 $29,509 $68,225
416,472
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs