| Plant Area |
96,237
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 2,016
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $185,177 | 2,144,199 |
kWh
|
$0.086 | |
| Electricity Demand | $16,224 | 7,768 |
kW-mo/yr
|
$2.09 | |
| Natural Gas | $286,767 | 22,133 |
MMBtu
|
$12.96 | |
| Other Energy | $85,061 | 1 |
MMBtu
|
$85,061.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $322 | 148 |
Tgal
|
$2.18 | |
| Water Disposal | $366 | 148 |
Tgal
|
$2.47 | |
| TOTAL YEARLY COSTS | $573,917 | ||||
| RECOMMENDED SAVINGS* | $48,041 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $33,561 | $47,970 | - | - |
$33,561
-
MMBtu
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,811 | $13,729 |
$8,797
96,844
kWh
|
$498
-
kW-mo/yr
|
- | $1,516 | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,510 | $2,834 |
$1,462
16,920
kWh
|
$48
-
kW-mo/yr
|
- | - | |
| 04 | 2.6211: Conserve energy by efficient use of vending machines | $1,357 | $716 |
$1,289
14,915
kWh
|
$68
-
kW-mo/yr
|
- | - | |
| 05 | 2.7261: Install timers and/or thermostats | $755 | $1,959 |
$755
8,728
kWh
|
- | - | - | |
| 06 | 2.1232: Keep boiler tubes clean | $47 | $83 | - | - |
$47
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $48,041 | $67,291 |
$12,303
137,407
kWh
|
$614
-
kW-mo/yr
|
$33,608
-
MMBtu
|
$1,516 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs