Assessment Year | 1997 |
---|---|
Principal Product | Molded Rubber Products |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
250,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,075 | 4,537,222 |
kWh
|
$0.035 |
Electricity Demand | $80,485 | 8,609 |
kW-mo/yr
|
$9.35 |
Electricity Fees | $47,601 | - |
|
- |
Natural Gas | $274,273 | 68,586 |
MMBtu
|
$4.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,468 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $165,264 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,645 | $5,151 |
$1,142
25,205
kWh
|
$2,503
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,860 | $345 |
$1,860
41,032
kWh
|
- | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,490 | $350 |
$3,490
76,788
kWh
|
- | - | - | - | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $3,575 | $5,757 |
$3,575
78,839
kWh
|
- | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $617 | $500 | - | - |
$617
-
MMBtu
|
- | - | |
06 | 2.2135: Repair and eliminate steam leaks | $3,700 | $1,200 | - | - |
$3,700
-
MMBtu
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $2,660 | $2,700 | - | - |
$2,660
-
MMBtu
|
- | - | |
08 | 2.2511: Insulate bare equipment | $7,824 | $5,127 | - | - |
$7,824
-
MMBtu
|
- | - | |
09 | 2.1213: Direct warmest air to combustion intake | $7,136 | $16,305 | - | - |
$7,136
-
MMBtu
|
- | - | |
10 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $137,441 | $16,000 |
$140
3,224
kWh
|
- | - | $54,681 | $82,620 | |
11 | 3.5217: Reuse / recycle/ sell paper products | $2,500 | $100 | - | - | - | $2,500 | - | |
12 | 4.515: Install shelves / racks to utilize unused space | $11,020 | $30,000 | - | - | - | $11,020 | - | |
TOTAL RECOMMENDED | $185,468 | $83,535 |
$10,207
225,088
kWh
|
$2,503
-
kW-mo/yr
|
$21,937
-
MMBtu
|
$68,201 | $82,620 | ||
TOTAL IMPLEMENTED | $165,264 | $64,700 |
$5,490
121,044
kWh
|
- |
$11,453
-
MMBtu
|
$65,701 | $82,620 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs