| Assessment Year | 1997 |
|---|---|
| Principal Product | PVC Window Extrusions |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 320 |
| Plant Area |
420,000
ft2
|
| Annual Production | 80,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $905,919 | 26,277,843 |
kWh
|
$0.034 |
| Electricity Fees | $507,713 | - |
|
- |
| Natural Gas | $97,774 | 16,348 |
MMBtu
|
$5.98 |
| LPG | $19,600 | 2,063 |
MMBtu
|
$9.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $254,546 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $55,783 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,851 | $13,131 |
$11,851
220,399
kWh
|
- | - | - | - | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $8,817 | $12,528 |
$8,817
163,834
kWh
|
- | - | - | - | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,593 | $360 |
$1,593
29,601
kWh
|
- | - | - | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $2,381 | $390 |
$2,381
44,256
kWh
|
- | - | - | - | - | |
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $10,203 | $1,439 |
$10,203
189,625
kWh
|
- | - | - | - | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,375 | $9,320 |
$17,100
317,702
kWh
|
$(-8,725.0)
-
MMBtu
|
- | - | - | - | |
| 07 | 2.3191: Use demand controller or load shedder | $23,639 | $5,000 |
$23,639
439,332
kWh
|
- | - | - | - | - | |
| 08 | 2.7243: Improve air circulation with destratification fans / other methods | $9,959 | $9,600 |
$(-410.0)
(-7,620)
kWh
|
$10,369
-
MMBtu
|
- | - | - | - | |
| 09 | 2.7314: Reduce ventilation air | $9,993 | $2,800 | - |
$9,993
-
MMBtu
|
- | - | - | - | |
| 10 | 2.2437: Recover waste heat from equipment | $7,702 | $1,725 | - |
$7,702
-
MMBtu
|
- | - | - | - | |
| 11 | 2.1331: Burn a less expensive grade of fuel | $17,100 | $12,000 | - |
$(-9,000.0)
-
MMBtu
|
$19,600
-
MMBtu
|
$6,500 | - | - | |
| 12 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $3,883 | $200 | - | - | - | - | $3,883 | - | |
| 13 | 3.5316: Contract a wood pallet recycling company | $6,000 | $200 | - | - | - | - | $6,000 | - | |
| 14 | 4.321: Optimize production lot sizes and inventories | $133,050 | $10,000 | - | - | - | - | - | $133,050 | |
| TOTAL RECOMMENDED | $254,546 | $78,693 |
$75,174
1,397,129
kWh
|
$10,339
-
MMBtu
|
$19,600
-
MMBtu
|
$6,500 | $9,883 | $133,050 | ||
| TOTAL IMPLEMENTED | $55,783 | $31,419 |
$45,900
853,166
kWh
|
- | - | - | $9,883 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | LPG Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs